My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-338A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-338A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 1:27:00 PM
Creation date
2/6/2024 1:13:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/21/1999
Control Number
1999-338A
Entity Name
Summit Construction Managerment Inc.
Subject
Addendum 1 Round Island Park
Project Number
9622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MD <br />Gam:ro -E -,* <br />4.1. Before submitting a Bid. each 'Bidder must (a) examine the Contract Documents <br />thoroughly; (b) visit the site to familiarize himself with local conditions that may <br />In any manner affect cost, progress or performance of the Work, (c)familiarize <br />himself with federal, state and local laws. ordinances, miles and regulations that <br />may in any manner affect cost, progress or performance of the Work-, and (d) <br />study and carefully correlate Bidders observations with the Contract <br />Documents, <br />4.2. Reference is made to the Supplementary Conditions for the identification of <br />those reports of investigations and tests of subsurface and latent physical <br />conditions at the site or otherwise affecting cost, progress or performance <br />of the Work which have been relied upon by Engineer In preparing the <br />Drawings and Specifications. <br />Before submitting his Bid each Bidder will, at this own expense, make such <br />additional investigations and tests as the Bidder may deem necessary to <br />determine this Bid for performance of the Work in accordance with the time, <br />price and other terms and conditions of the Contract Documents <br />4.3. On request Owner will provide each Bidder access to the site to conduct <br />such investigations and tests as each Bidder deems necessary for <br />submission of his Bid. <br />4.4. The lands upon which the Work is to be performed, rights-of-way for access <br />thereto and other lands designated for use by Contractor In performing the <br />Work are identified in the Supplementary Conditions, General Requirements <br />or Drawings. <br />4.5. The submission of a Bid will constitute an Incontrovertible representation by <br />the Bidder that he has complied with every requirement of this Article 4 and <br />that the Contract Documents are sufficient in scope and detail to indicate <br />and convey understanding of all terns and conditions for performance of the <br />Work. <br />5. Interpretg1jons <br />All questions about the meaning or intent of the Contract Documents shall be <br />submitted to Engineer in writing. Replies will be issued by Addenda mailed or <br />delivered to all parties recorded by Engineer as having received the 'Bidding <br />Documents. Questions received less than ten days prior to the date for opening of <br />Bids will not be answered. Only questions answered by formal written Addenda will <br />be binding. Oral and other interpretations or clarifications will be without legal <br />effect. <br />u <br />-.N5TPUC—,joti5 To BIDDERS <br />IB•2 <br />ka <br />
The URL can be used to link to this page
Your browser does not support the video tag.