C] <br />SupplementaryConditions) of the Contract Docurnents as are reasonably necessary for the execution <br />of the Work. Additional copies will be fimuslied, upon request, at the cost of reproduction. <br />Commencement of Contract Time-, Notice to Proceed: <br />2.3 The Contract Tittte will commence to run on the day indicated in the Notice to Proceed. A Notice to <br />Proceed may be given at any time after tine effective date of the Agreement. In no event will file <br />Contract Time commence to run later than the seventy-fifth (75) day after the dray of Bid opening. <br />Starting (lie Project: <br />2.4 CONTRACTOR shall start to perform the Work on the date wizen the Contract Time commences to <br />run, but no Work shall be done at the site prior to the date on which the Contract. Time commences to <br />run. <br />Before Starting Construction - <br />2.5 Before undertaking each part of the Work, CONTRACTOR shall carefully study and compare the <br />CONTRACT Documents acid check and verify pertinent figures shown thereon and all applicable field <br />measurements. CONTRACTOR shall promptly report in writing to ENGINEER any conflict, error <br />or discrepancy which CONTRACTOR may discover and shall obtain a written interpretation or <br />clarification from ENGiNEER before proceeding with any Work affected thereby; however, <br />CONTRACTOR shall not be liable to OWNER or ENGINEER for failure to report any conflict, error <br />or discrepancy in die Contract Documents, unless CONTRACTOR had actual knowledge thereof or <br />should reasonably have known thereof. <br />2.5 Within ten (10) days after the Effective Date of the Agreement (unless otherwise specified in die <br />General Requirements), CONTRACTOR shall submit to ENGINEER for review <br />2,5.1 an estimated progress schedule indicating the starting and completion dates of tile various <br />stages of the Work; <br />2.6.2 a preliminary schedule of Shop Drawing submissions; and <br />2.6.3 a preliminary schedule of values for all of die Work which will include quantities and prices <br />of 'items aggruLatting the Contract Price and will subdivide the Work into component parts in <br />sufficient dctail to serve as the basis for progress payments during construction. Such prices <br />will include an appropriate amount of overhead and profit applicable to each item of Work <br />which will be confirmed in writing by CONTRACTOR at die tine of submission <br />2.7 Tet (10) days prior to any work commencing, CONTRACTOR shall deliver to OWNER, with a copy <br />to ENGINEER, certificates (and other evidence of insurance requested by OWNER) which <br />CONTRACTOR is required to purchase and maintain in accordance with Section 5. <br />Precontitruction Conference: <br />2.8 Within twenty (20) days after the Effective Date of the Agreement, but before CONTRACTOR starts <br />the Work at die site, a conference attended by CONTRACTOR, ENGINEER and odiers as <br />appropriate will be held to discuss the schodules referred to in paragraph 2.6, to discuss procedures <br />for handling Shop Drawings and other submittals and for processing Applications for Payment, and <br />to establish a working understanding among the parties as to the Work. <br />GENERAL. CONDITIONS L_f <br />GC ^ 4 <br />t.. <br />