Laserfiche WebLink
407""s F. <br />s <br />J <br />40 <br />G. <br />• U.S.A.C.O.E. — N/A, Note: permit is not required since the proposed work in <br />the wetland is 100% excavation. <br />• Coordination with I.R. County Mosquito Control <br />Engineering final design and specifications <br />• Prepare plans and specifications for structures, piping, excavation, and swales <br />as required for items listed in Section 1. This includes environmental <br />consultant for wetlands. <br />Five (5) review meetings of design and specifications, with County staff. <br />Specifications shall include summary of estimated quantities and soils reports from <br />testing laboratory. One (1) review meeting with SIRWMD staff. <br />• Program meeting to outline survey work and scope as defined. <br />• Preparation and/or review of J.P.A. exhibits prior to submittal to F.D.O: r. <br />• 60% drawings and specifications, (survey information and preliminary design) <br />• 90% construction plans and specifications, (permit plans) <br />• 1M% construction plans and specifications, (construction plans) <br />County will supply their s•rANDARD BID documents. <br />Reimbursable% - soil testing, %nail, printing, telephone <br />No additional services are included for fallow through after we submit lin.al plans and <br />r,lx.<a to the County. <br />SECTION IV • TIMI; FOR COMI'I,h:hlf)N <br />A. Aflcr rrc cipt of wiittx n authorization to pra eed, CAI will proceed with the work bused ,m 11 <br />following, schedulrt <br />• Subrnit 60% plan% and specifications 75 clays <br />• County Review 15 d.ty% <br />• Suhrnit 90',rc• plans 3t) days <br />• County, SIRWMD, ID07', and FF,C Review 45 days <br />• Submit I(NI';: plan. 30 days <br />SECTION V • COMPENSATION <br />The COUN-rY agrees to pay, and the ENGINEER agrees to accept fee for services rendered according, <br />to the Scope of Services, Task 2, identified in Siction III of this work order with a maximum charge under this <br />work order of $43,47000. •f he attached Fxhihit A indicate% the itemized man-hour changes. The fee is <br />summarized as follows: <br />A. <br />Joint Project Ayreernent, Fxhihits and Tcchnical Assistance <br />�':. 1.835 <br />B. <br />Boundary and Topographic Survey of CM -Site Areas <br />5 8,550 <br />C. <br />Schedule and Coordinate Soil Borings and <br />Evaluate Barings <br />5 170 <br />D. <br />Environmental Report and Permitting and <br />$ 9,15.5 <br />Wetland Boundary Survey of Off Site Mitigation Area <br />E. <br />Permit Plans and Calculations <br />$14,050 <br />F. <br />Engineering - Final Design, Construction Plans, <br />$ 3,080 <br />Specifications, Summary of Quantities <br />G. <br />Review Meetings with County and SIRWMD- 6 Required <br />$ 2,910 <br />I1. <br />Reimbursable <br />$ 750 (Estimated) <br />Soil borings - At cost, reference Fraser quote dated 12/14/99 <br />70 <br />Total <br />$43,470 <br />1:\CYN\ENGPROAIRCStormwtrMgmtl—prove\IRC-WORK <br />ORDER NO.4-Gifford.doc <br />Page 3 of 5 <br />