My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-046
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 11:05:00 AM
Creation date
2/13/2024 10:53:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
02/15/2000
Control Number
2000-046
Agenda Item Number
11.G.1.
Entity Name
William Glover, Inc.
Subject
Change Order for Wabasso Causeway Park Improvements
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />40 <br />Cl <br />04 <br />r <br />Unless otherwise required in the Technical Specifications [lie following criteria shall apply to all <br />submittals requiring the Architect's review and approval: <br />l <br />I . SHOP DRAWINGS: <br />Shop drawings shall be prepared accurately and to a scale sufficient to show all requisite <br />information pertinent to the submitted item or assembly. <br />Number shop drawings consecutively and indicate the following: <br />1. Working erection dimensions and/or field dimensions. <br />2. Arrangements, sectional views. <br />3. Necessary details, including complete information for making connections with <br />other work. <br />Q, kinds of materials, finishes. <br />t <br />5. Date, project name, descriptive names of equipment, classified item numbers, <br />locations at which materials or equipment are to be installed in work. <br />i <br />i <br />Submit shop drawings by transmittal letter containing project name, Contractors name. <br />number of drawings, titles, date, other pertinent data. <br />r <br />i Contractor shall review, thoroughly check and approve shop drawings prior to submitting <br />to the Architect for approval. At the time of Submittal to the Architect. the Contractor <br />shall inform the Architect in writing of' any deviation in the submittal front the <br />requirements of the Contract Documents. <br />Submit six (G) bound sets of strop drawing prints for review. Satisfactory drawings will <br />be so identified, dated and three (3) copies returned to the Contractor. Should shop <br />drawings be disapproved, corrections will be indicated on one (1) only of the returned <br />I sets.. <br />t " Re -submittals shall be in the satire forniat as described above until such time as approval <br />is obtained from the Architect. <br />Changes or corrections marked by the Architect on shop drawing submittals shall not be <br />considered as an order for extra work by the Contractor but only clarification of <br />d rectitis menta oaf' the Contract In 0w .li ti. omraclol t, Kea exception to <br />! %u6j utwections heing inconsistent with the Contract tract Do ument requirements, he shall <br />notify the Architect promptly in writing before proceeding with the work. <br />2. PHYSIC'AI. SAMPLES: <br />Submit samples as follows: <br />r I. Submit samples in triplicate (3), of siv..e called for I)v ear•h welion, showitiv <br />quality, type, color, range, finish, texture. <br />11f <br />V <br />
The URL can be used to link to this page
Your browser does not support the video tag.