Laserfiche WebLink
e <br />4 <br />L <br />2. Where specifications require manufacturces printed installation directions, submit <br />triplicate (3) copies of such directions with samples, <br />3. Prepay transportalion charges to Architect's office on samples forwarded, <br />4. Label each sample with material name, quality, Contractor's name, date project <br />name, other pertinent data. <br />3. CATALOG DATA/MANUFACTURERS INSTALLATION INSTRUCTIONS: <br />When submissions are in the !form of loose pages (approximately 8 1/2" by 1 l" in size),. <br />such shall be submitted in sets with each containing one of each drawing and schedule <br />submitted, assembled in portfolio binders showing on the covers of first page inside a <br />complete fist of contents. Submittal of complete catalogues with one or more items <br />checked therein will not be accepted. <br />Submit Catalog Data and/or Installation Instructions by transtnittal letter containing <br />project name, Contractor's name, description of submittal, date, other pertinent data. <br />Contractor shall review, thoroughly check and approve Catalog Data and/or installation <br />instructions prior to submitting to the Landscape Architect for approval. At the time of <br />Submittal, the Contractor ~hall inform the Landscape Architect in writing of any deviation <br />in the submitted material from the requirements of the Contract Documents. <br />Submit six (b) sets of each item for review. Satisfactory submittals will be so identified, <br />d.ted and three (3) copies returned to the Contractor. Should an iters be disapproved, <br />corrections will be indicated on one (1) copy only of the returned data. <br />Re -submittals Shall be in the same format as described above until such time as approval <br />is obtained. <br />Changes or corrections to Catalog Data anti/or Installation Instructions Shall not be <br />considered as an order for extra work. <br />PART 3 - EXECUTION <br />TIME OF SUBMITTAL: <br />Submittals shall be in accordance with the t'ollowing from date of Notice to Proceed. <br />ITEM SUBMITTALS, *ArPROVAL <br />All submittals required Fifteen ( 15) Days Fiflcen (15) Days <br />*From date of receipt of submittal. <br />Delays on account of tardy or untimely subminals will ntrt be considCred .as catlwk4 for extension <br />of titre or the Contract or increases to the Corm -act Sum. <br />10.3 <br />