My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-046
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 11:05:00 AM
Creation date
2/13/2024 10:53:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
02/15/2000
Control Number
2000-046
Agenda Item Number
11.G.1.
Entity Name
William Glover, Inc.
Subject
Change Order for Wabasso Causeway Park Improvements
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 2A - CLEARING AND GRUBBING <br />' I. SCOPE <br />A. The Contractor shall furnish all labor, materials and equipment, and all <br />t operations required to clear and grub the site as shown on the Plans and <br />specified herein. <br />2. GENERAL <br />A. Clearing and grubbing shall consist of the complete removal and disposal <br />of all trees, brash, labs, stumps, roots, weeds, rubbish, rocks, pavement <br />and structures designated to be removed, concrete and other deleterious <br />material and obstructions resting upon or protruding through the surface of <br />the ground. Stumps, roots 3" and over and similar obstructions shall be <br />removed to ca minimum depth of 2 feet below the existing ground. Existing <br />! pavement to be removed shall be saw cut at the interface where existing <br />h pavement is to retrain. All structural items shall be excavated to full <br />c <br />depth, completely removed, and the excavation backfilled per these <br />specifications. <br />B. The Contractor shall clear and grub the areas described below: <br />+ 1) Within the areas of development. <br />3. DISPOSAL <br />{ A. BURNING PERMITTED ON SITE <br />a I) When permitted by local governing .authorities, trees, stumps, <br />o brush, weeds and similar natural materials may be burned on site, <br />The Contractor shall dispose of all unburned residue offsite, and if <br />required by the Engineer, spread the ash. Material which will not <br />i bum or will not burn without :tir pollution such as asphalt and tires <br />shall be hauled off site for disposal in an approved manner. <br />Y_ <br />B. OFF SITE DISPOSAL <br />I) When on Site burning is not permitted, all material shall be hauled <br />off site by the Contractor for disposal in an approved manner. <br />C. The Contracinr shall be responsible for ohtaininft .and complying with the. <br />provisions of all necessary permits. All lees shall he paid by the <br />Contractor. <br />D. No material shall be buried out site. <br />Ls <br />Mi <br />
The URL can be used to link to this page
Your browser does not support the video tag.