My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-046
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 11:05:00 AM
Creation date
2/13/2024 10:53:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
02/15/2000
Control Number
2000-046
Agenda Item Number
11.G.1.
Entity Name
William Glover, Inc.
Subject
Change Order for Wabasso Causeway Park Improvements
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />40 <br />4D <br />• <br />SECTION 2D - SITE CLEANUP & RESTORATION <br />SCOPE <br />A. The Contractor shall furnish all plant, labor, equipment, appliances and <br />materials required or necessary to clean up the site after the construction <br />is completed and to restore items disturber) or damaged due to his <br />construction operation. <br />GENERAL <br />A. During the progress of the project, the work and the adjacent areas <br />affected thereby shall he kept in a neat and orderly condition. All <br />rubbish, surplus materials, and unused construction equipment shrill be <br />removed. All damage shall be repaired so that the public zinc[ private <br />property owners will be inconvenienced as little as possible. <br />B. Where material or debris has been deposited in watercourses, ditches, <br />gutters, drains, or catch -basins as a result of the Contractor's operations, <br />such material or debris shall be entirely removed and satisfactorily <br />disposed of during the progress of the work, .Ind the ditches, channels, <br />brains, etc., shall be kept clean.. <br />C. Before the completion of the project, the Contractor shall, unless <br />otherwise especially directed or permitted in writing„ tear down <br />and remove all temporary buildings Incl structures which he builds; <br />remove all temporary works, tools, and machinery or other <br />construction equipment furnished by him; remove, acceptably disinfect. <br />and coverall organic inatter and material containing organic matter in. <br />under, and around privies, houses, and other buildings used by him; <br />remove all rubbish from any ground~ which he has occupied, and leave <br />the roads, all pans of the premises and adjacent property affected by his <br />operations, in a neat and satisfactory condition. <br />D. It shall be the r. sponsibility of the Contractor to repair, rebuild, or restore <br />to its former conditions, any and all portions of existing utilities;, <br />structures, equipment, appurtenances, trees and shrubs, or facilities, other <br />than those to be paid for under the specifications, which may be disturbed <br />or damaged due to his construction operations. <br />E. The Contractor shall thoroughly clean all materials and equipment <br />installed by him and his subcontractors and on completion c11' the work <br />:Miall deliver Elie [cii;ilitieS un[tatiiaigUd Mid iia tre:,ii ;laid vw%% ,il��r<<ufll <br />condition. <br />MM <br />
The URL can be used to link to this page
Your browser does not support the video tag.