Laserfiche WebLink
CI <br />40 <br />4W <br />• <br />B. PROTECTION <br />1. Trees moved by winch or crane shall be thoroughly protected from chain <br />marks, girdling, or other bark slippage by means of burlap, wood battens or <br />other approved method. <br />2. Container grown plants shall be carefully removed from [lie container so as <br />not to disturb the root system. Spade shall not be used to cut containers. <br />S. ]OB CONDITIONS <br />A. EXISTING CONDITIONS <br />1, The contractor shall verify all site conditions prior to construction. <br />2. The Contractor shall exercise care in digging and other work so as not to <br />damage existing work including underground pipes and cables, and the pipes <br />and hydrants of watering systems. Should such overhead or underground <br />obstructions be encountered which interfere with planting the location of <br />plants shall be adjusted to clear such obstruction. <br />3. Should any objectionable materials such as old concrete, bricks, or other <br />debris be encountered during platting operations, they shall be removed from <br />the site by the Contractor. <br />B. SCHEDULING <br />1. In general the work shall proceed as rapidly as the site becomes available. <br />2. Landscape installation shall not begin until an adequate source of water is <br />available on site. <br />3. The Contractor shall he responsible for coordinating his work with all other <br />parties involved with the job in order the eliminate unnecessary complication <br />during the installation of his work. <br />Q. Upon substantial completion of work, the Contractor shall request a walk- <br />through by the Landscape Architect to formulate .t "putsch list". Contractor <br />shall complete "punch list" items',is quickly as possible, and request another <br />walk-through to verify completion. Upon successful completinn of th- <br />"°punvh list" items, the work will be accepted by the Owner. <br />G. GUARANTEE <br />A. Considering that the Owner will be responsible for maintaining all materials after <br />acceptance, the Contractor shall guarantee to replace all plant nuncrial,� for ai <br />period of time after tonal acceptance its follows: <br />is <br />