Laserfiche WebLink
40 <br />• <br />4D <br />I <br />® b. Performance Bond(If required) <br />c. Payment Bond(If required) <br />r d, Certificate of Insurance <br />20. RACI <br />9 <br />Should bidder to whom the contract has been awarded refuse or fail to complete the <br />requirements of Article 19 above within ten (10) days after Notice of Award, the additional <br />i time in calendar days required to correctly complete the documents will be deducted, in equal <br />amount, from the Contract time, or the County may elect to revoke Bid Bond of any Bidder <br />tailing to execute the awarded Contract shall be held by the County for consequential <br />4 damages incurred, and the Contract awarded as the Commission desires. <br />l <br />T <br />