Laserfiche WebLink
� I <br />40 <br />E-3 <br />• <br />NVabasso Causeway Park <br />Project No. 9623B <br />Iteniked Bid Schedtde (Exhibit "A" to Agreenient) <br />Item <br />I V— f-1—.t;f1- I ";t I '"it pf4pp pvton6nn <br />I <br />Mobilization and General Conditions <br />I <br />LS <br />S27,826.20 <br />527,826.20 <br />2 <br />Construction Stakinu <br />I <br />LS <br />$9,209.00 <br />58,208.00 <br />3 <br />Cicarin2 and glubbi g <br />4.4 <br />Acres <br />53.780.00 <br />516.632.00 <br />Excavation & demolition <br />I <br />LS <br />57,020.00 <br />57.020.00 <br />-4 <br />5 <br />Sedimentation. siltation and erosion control <br />I <br />LS <br />S13.770.00 <br />513.770.00 <br />6 <br />Select sand fill <br />783 <br />CY <br />59.64 <br />56,765.12 <br />7 <br />Filter fabric for rock revetment <br />27.800 <br />SF <br />50.27 <br />57,506.00 <br />8 <br />Annor and beddjpj stones, 16" to 18" dia. <br />3,090 <br />Toms <br />551.94 <br />5160,185.60 <br />9 <br />Beddine stones. 2" to 6" dia. <br />580 <br />Tons <br />548.60 <br />529,188.00 <br />10 Finish gradin and compaction <br />21,400 <br />SY <br />51.19 <br />$25,423.20 <br />11 <br />Turf Block" pavers, including 1.5" thick ;.and <br />base; joints and voids Med with sand. <br />4,425 <br />SF <br />53.37 <br />1 <br />514,910.48 <br />12 <br />Concrete sidewaM, 6" thick <br />732 <br />SY <br />S26.84 <br />519,645.42 <br />13 <br />Concrelc wheel stops, precast, 61ona <br />121 <br />Each <br />$24.81 <br />$3,001.72 <br />14 <br />Handicapped parking signs and pressure irealed <br />himber parking space delineation <br />8 <br />Each <br />5259.20 <br />52.07160 <br />15 <br />Wastewater pumping station. include RTL: <br />terminals in control panel for future R1 -U to be <br />instaUed by Others. <br />I <br />Each <br />543,507.80 <br />543,507.80 <br />16 Sanitary sewer main. 6" Dia. DIP <br />80 <br />LF <br />544,28 <br />53,542.40 <br />17 <br />Force main. 3" dia. HDPE.SDR- 11 <br />80 <br />LF <br />513.50 <br />S1,080.00 <br />1$_ <br />Sanitary sewer clean-out <br />I <br />Each <br />5243.00 <br />$243.00 <br />19 <br />Connection to existing sewer force main <br />I <br />Each <br />51,890.00 <br />$1,890.00 <br />20 <br />Directional Bore 3" dia. for sewer, no casing, <br />60 <br />I -F <br />530.24 <br />$1,814.40 <br />21 <br />Connection to existing water main <br />I <br />Each <br />$928.80 <br />5928,80 <br />22 <br />Directional Bore 2" dia. for water, no casing <br />60 <br />LF <br />523.76, <br />$1,425.60 <br />23 Water sei-,i c c main. 2"" dia. I IDPE. S D R- I 1 <br />180 <br />LF <br />54.32 <br />5777.60 <br />24 <br />lBack-flow Prevenger, 2" dia. <br />I <br />Each <br />$918.0 <br />S918.00 <br />25 Water service line. 3 4" dia. polvethylenc <br />22 <br />I -F <br />S3.24 <br />571.28 <br />26 Maintenance of Traffic <br />I <br />LS <br />$5,400-00 <br />$5,400.00 <br />17 <br />28 <br />jLmpraryconstruc:bon sign <br />f1toject sign <br />2-06.60 <br />4 <br />F j_clj <br />Each <br />____ <br />$432.00 <br />— S853,20 <br />51,728.00 <br />29 <br />lcvalcd restroom building <br />I <br />I -S <br />5110 077.27 <br />5110,077.27 <br />30 electrical service connection and riser for <br />restroom building <br />I <br />LS <br />S1,080,00 <br />51,080.01) <br />31 <br />Elcvatcd wooden wilkwav and entrance deck <br />I <br />LS <br />$49,788,00 <br />$42,788.00 <br />12 She"t:r,rowur <br />. I <br />I EJA <br />$2,893.32, <br />$2,893.321 <br />ADDENOUM NO 2 810 PROPOSAL BP -3 <br />