Laserfiche WebLink
33 Tem orad irri ation syswin <br />1 <br />LS <br />$6,480.00 <br />$6,480.00 <br />34 Seagrape, 10 gal. <br />14 <br />Each <br />586.40 <br />51,209.60 <br />35 Scagra e, 3 gal. <br />89 <br />Each <br />510.80 <br />$961.20 <br />36 Yau on Holl•.. 10 gal. <br />22 <br />Each <br />586.40 <br />51,900.80 <br />37 Yau onHoIl•.3 gal. <br />299 <br />Each <br />S10.80 <br />53,229.20 <br />38 lWeeping Yau on Holl. 30 gal. <br />I <br />Each <br />5216.00 <br />$216.01 <br />39 ive Oak, 5.5" cal.,SP'ECL\IEN <br />19 <br />Each <br />5864.00 <br />516.416.00 <br />40 IFlorida Ked Bay. 45 gal. <br />12 <br />Each <br />5243.00 <br />52.916.00 <br />41 ICabbage Pah. 8'- 16' <br />286 <br />Each <br />599.36 <br />528,416.96 <br />42 Owarf Yau on 1Iolh, 3 ¢al. <br />362 <br />Each <br />510.80 <br />53909.60 <br />43 ISand Cord ass. 3 gal, <br />2.053 <br />Each <br />53.78 <br />57,760.34 <br />44 Saw Pahnetto (silNer). 3 gal. <br />548_ _ <br />Each <br />523.22 <br />512.724.56 <br />45 Nec4:lace Pod, 3 gal. <br />67 <br />Each <br />511.88 <br />5795,96 <br />46 Silver Sea Chew, 1 gal. <br />1,146 <br />Each <br />55.40 <br />56,188.40 <br />47 Dune Sunflower, 1 gal. <br />81 <br />Each <br />55.40 <br />$437.40 <br />48 Blanket rower, 1 gal, <br />223 <br />Each <br />55.40 <br />51,204.20 <br />49 Ria Grass 1 1. <br />691 <br />Each <br />55.40 <br />53,731.40 <br />50 Sod, Common Bermuda <br />173,046 <br />SF <br />SO.231 <br />516.566.83 <br />51 Shredded: ' cess Bark Mulch <br />1 404 <br />C'1' <br />$27.001 <br />510,908.04 <br />total Base IJKI �i 3i3`J3,140.4) � <br />.l reowH,rro rz�,r�• <br />Al <br />ighting system for fishing catwalks, including <br />1 <br />Ls <br />525,407.00 <br />525,407.00 <br />electrical service connections and risers <br />A2 <br />Trash receptacles, including base mounting <br />16 <br />Each <br />5399.60 <br />56,393.60 <br />concrete and utstal[lation hardware <br />A3 <br />Park bench, 6' long, including base mounting <br />14 <br />Each <br />5267.84 <br />53,7.49.76 <br />concrete and installation hardware <br />1 otal Altenmates =¢ <br />Total Combined Bid 5730,696.82 <br />ADDENDUM NO 2 E31D PROPOSAL SP -4 <br />