Laserfiche WebLink
40 <br />C_A <br />40 <br />�r <br />under extraordinary circumstances. The superintendent will be CONTRACTOR's representative <br />at the site and shall have authority to act on behalf of CONTRACTOR. All communications given <br />i to the superintendent shall be as binding as if given to CONTRACTOR. <br />Labor, Materials and Equipment: <br />6.3 CONTRACTOR shall provide competent, suitable qualified personnel to survey and lay out the <br />Work and perform construction as required by the Contract Documents. CONTRACTOR shall at <br />} all times maintain good discipline and order at the site. Except in connection with the safety or <br />protection of persons or the Work or property at the site or adjacent thereto, and except as otherwise <br />indicted in the Contract Documents, all Work at the site shall be performed during regular working <br />i hours, and CONTRACTOR will not permit overtime work or the performance of Work on Saturday, <br />Sunday or any legal holiday without OWNER's written consent given after prior written notice to <br />ENGINEER. <br />r 6A Unlcss otherwise specified in the General Requirements, CONTRACTOR shall furnish and assume <br />full responsibility for all material, equipment, labor, transportation, construction equipment and <br />machinery, tools, appliances, fuel power, light, heat, telephone, water sanitary facilities, temporary <br />f facilities and all other facilities and incidentals necessary for the furnishing, performance, testing, <br />I start-up and completion of the Work. <br />6.5 All materials and equipment shall be of good quality and new, except as otherwise provided in the <br />Contract Documents. if required by ENGINEER, CONTRACTOR shall fumish satisfactory <br />evidence (including reports of required tests) as to the kind and quality of materials and equipment. <br />r All material and equipment shall be applied, installed, connected, erected, used, cleaned and <br />conditioned in accordance with the instructions of the applicable Supplier except as otherwise <br />provided in the Contract Documents; but no provision of any such instructions will be effective to <br />I assign to ENGINEER, or any of ENGINEER's consultants, agents or employees, any duty or <br />authority to supervise or direct the furnishing or performance of the Work or any duty or authority <br />to undertake responsibility contrary to the provisions of paragraph 9.15 or 9.16. <br />r <br />Adjusting Progress Schedule: <br />6,6 CONTRACTOR shall submit to ENGINEER for acceptance (to the extent indicated in paragraph <br />2.9) adjustments in the progress schedule to reflect the impact thereon of new developments; these <br />will conform generally to the progress then if effect and additionally will comply with any <br />provisions of the General Requirements applicable thereto, <br />i <br />t Substitutes or "Or -Equal" items: <br />q 6.7.1. Whenever materials or equipment are specified or described in the Contract DOenmenls by using <br />t the name of a proprietary item or the name of a particular supplier, the naming of the item is <br />intended to establish the type, Junction and quality required and to cslablish a basis for bidding. <br />i Unless the name is followed by words indicating that no substitution is permilted, substitute <br />t materials or equipment may be reviewed by Engineer il' sufficient information is supplied by <br />CONTRACTOR to allow Engineer to evaluate the proposed substitution. The use of materials or <br />equipment other than those named shall be considered a substitution, which will be considered only <br />after a contract for the: Work is awarded. <br />6.71. If CONTRACTOR wishes to furnish or use a substitute iter=.r of material or equipment,. <br />CONTRACTOR shall make written application to Engineer For review thereof, certifying that the <br />proposed substitute will perform the functions and achie�e the results called I'or by the Contract <br />Documents, be similar and ofequal substance to that ,lice, tied and be suited to the same use as that <br />l specified. 'Me application will state that the evaluai ion and rL view oI the proposed subsi ltnte will <br />UliNlitiAt. CON IYl I II SNti <br />cc - it <br />