2000-046
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 11:05:00 AM
Creation date
2/13/2024 10:53:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
02/15/2000
Control Number
2000-046
Agenda Item Number
11.G.1.
Entity Name
William Glover, Inc.
Subject
Change Order for Wabasso Causeway Park Improvements
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CI <br />i <br />not prejudice CONTRACTOR'S achievement of Substantial Completion on time, whether or not <br />review of the substitute for use in the Work wi11 require a change in any of the Contract Documents <br />(or in the provisions of any other direct contract with OWNER for work on the Project) to adapt the <br />design to the proposed substitute and whether or not incorporation or use of the substitute in <br />connection with the Work is subject to payment of any license fee or royalty. All variations of the <br />proposed substitute from that specified will be identified in the application and available <br />maintenance, repair and replacement service will be indicated. The application will also contain an <br />itemized estimate of all costs that will result directly or indirectly from use of such substitute, <br />including costs of redesign and claims of other contractors affected by the resulting change, all of <br />whish shall be considered by Engineer in evaluating the proposed substitute. <br />6.7.3. The procedure for review by Engineer will include the following: <br />a. Requests for review of substitute items of material and equipment will not be accepted by <br />Engineer from anyone other than CONTRACTOR. <br />b. Upon receipt of an application for review of a substitution, Engineer will determine whether <br />the review will be more extensive than a normal shop drawing review for the specified item. <br />c. If the substitution will not require a more extensive review, Engineer will proceed with the <br />review without additional cost to CONTRACTOR. <br />d. If the substitution requires a more extensive review, Engineer will proceed with the review <br />only after CONTRACTOR has agreed to reimburse OWNER for the review cost. <br />C. Engineer may require CONTRACTOR to fumish at CONTRACTOR'S expense additional <br />data about the proposed substitute. <br />6.7:4. If a specific means, method, technique, sequence or procedure of construction is indicated in or <br />required by the Contract Documents, CONTRACTOR may furnish or utilize a substitute means, <br />method, sequence, technique or procedure of construction acceptable to Engineer, if <br />CONTRACTOR submits sufficient information to allow Engineer to determine that the substitute <br />proposed is equivalent to that indicated or required by the Contract Documents. The procedure for <br />review by Engineer will be similar to that provided in paragraph G.I as applied by Engineer (and <br />as may be supplemented in the General Requirements). <br />6.7.5. Engineer will be allowed a reasonable time within which to evaluate each proposed substitution. <br />Engineer will be the sole judge of acceptability and shall have lite right to deny use of any proposed <br />substitution. The CONTRACTOR shall not order, install or utilize any substitution without either <br />an executed Change Order or Engineer's notation on the reviewed shop drawing. OWNER may <br />require CON`T`RACTOR to furnish at CONTRAC'TOR'S expense a special nlanuficlurer's <br />performance guarantee(s) or other surety with respect to any substilule and an indemnification by <br />the CONTRACTOR. Engineer will record time required by Engineer and Engineer's consultants <br />in evaluating substitutions proposed by CONTRACTOR and in making changes in the Contract <br />Documcnis occasioned thereby. Whether or not a proposed substitute is used, CONTRACTOR shall <br />reimburse OWNER for lite charges of Engineer and Engineer's consultants for evaluating each <br />proposed substitute. <br />6.7.6. Substitute materials or equipment rnay be proposed for acceptance in accordance with these <br />paragraphs (F.1 through F.6). In lire event that substitute materials or equipment are used and are <br />less costly than the originally specified material or equipment, than the net difference in cost shall <br />benefit the OWNER and CONi'RAM'OR in equal proportions. This cost difference shall not be <br />reduced by any failure of the CONTRACTOR to hale his bid on the named materials or equipment. <br />Concerning Subcontractor, Suppliers and Others: <br />6.8 CONTRACTOR shall not employ any Subcontruc:iur, Supplier or other person or organization <br />(including those acceptable tm OWNER or ENGINE Ek as nidicated in paragraph +6.10), whellier <br />(iFralRAI.CONDITIONS <br />GC - 12 <br />