My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-046
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 11:05:00 AM
Creation date
2/13/2024 10:53:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
02/15/2000
Control Number
2000-046
Agenda Item Number
11.G.1.
Entity Name
William Glover, Inc.
Subject
Change Order for Wabasso Causeway Park Improvements
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.5.5 Costs clue to the negligence of CONTRACTOR, any Subcontractor, or anyone <br />directly or indirectly employed by any of them or by anyone for whose acts any of <br />them may be liable, including but not limited to, the correction of [defective Work. <br />Disposal of materials or equipment wrongly supplied and making good any damage <br />to property. <br />11.5.6 Other overhead or ,general expense costs of any kind and the costs of any item not <br />specifically and expressly included in paragraph 11 A. <br />CONTRACTOR'S Fee: <br />11.6 The CONTRACTOR's Fee allowed to CONTRACTOR for overhead and profit shall be detennined <br />as follows: <br />11.6.1 a mutually acceptable fixed fee; or if none can be agreed upon, <br />11.6.2 a fee based on lite following percentage of the various portions of the Cost of the <br />Work: <br />11.6.2.1 The amount of credit to be allowed by CONTRACTOR to <br />OWNER for any change which results in a net decrease in cost will <br />be the amount of the actual net decrease plus a deduction in <br />CONTRACTOR's Fee by an amount equal to ten percent (10%) of <br />the net decrease. <br />11.6.2.2 When both additions and credits arc involved in any one charge, <br />the adjustment in CONTRACTOR's Fee shall be computed on the <br />h basis of the net change. <br />11.7 Whenever the cost of any Work is to be determined pursuant to paragraph 11.4 or 11.5, <br />CONTRACTOR will submit in form acceptable to ENGINEER an itemized cost breakdown together <br />with supporting data. <br />Cash Allowances: <br />11.8 It is understood that CONTRACTOR has included in the Contract Price all allowances so named in <br />I the Contract Documents and shall cause the Work so covered to be done by such Subcontractors or <br />t Suppliers and for such sums within the limit of the allowances as may be acceptable to ENGINEER. <br />CONTRACTOR agrees that: <br />11 X1 the allowances include the cost to CONTRACTOR (less any applicable trade <br />discounts) of materials and equipment required by the allowances to be delivered <br />vkt 1he site, and all applicable taxes; and <br />1 11.81 t-(* i itAL lOR`s costs for unloading and handling on the site, labor, installation <br />costs, overhead, profit and other expenses contemplated for the allowances have <br />been included in the Contract Price and not in the allowances. No demand for <br />additional payment on account of any thereof of any thereof will be valid. <br />Prior to final payment, an appropriate Change Order will be issued as recommended <br />by ENGINEER to tilicLi actual ais,t,ani:. due CON TRAC R -IR on account of Work <br />covered by allowances, and the Contract Price shall he correspondingly adjusted. <br />1. <br />G NFRAI. ('0NI ITIONS <br />cc 2s <br />r f. <br />