My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-046
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 11:05:00 AM
Creation date
2/13/2024 10:53:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
02/15/2000
Control Number
2000-046
Agenda Item Number
11.G.1.
Entity Name
William Glover, Inc.
Subject
Change Order for Wabasso Causeway Park Improvements
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />ti <br />40 <br />em Partial Utilization: <br />14.10 Use by OWNER of any finished part of the Work which has specifically been identified in the <br />Contract Documents, or which OWNER, ENGINEFR and CONTRACTOR agree constitutes a <br />separately functioning; and usable parlor the Work that can be used by OWNER without significant <br />interference with CONTRACTOR's performance of the remainder of the Work, may be <br />accomplished prior to Substantial Completion of all the Work subject to the following;: <br />14. 10.1 OWNER at any time may request CONTRAC'T'OR in writing to permit OWNER to use any <br />such part of the Work which OWNER believes to be ready for its intended use and <br />substantially complete. IrCONTRACTOR agrees, CONTRACTOR will certify to OWNER <br />and ENGINEER that said part of the Work is substantially complete and request <br />ENGINEER to issue a certificate of Substantial Completion for that part of the Work. <br />CONTRACTOR at any time may notify OWNER and ENGINEER in writing that <br />CONTRACTOR considers any such part of the Work ready for its intended use and <br />substantially complete and request ENGINEER to issue a certificate of Substantial <br />Completion for that part of the Work. Within a reasonable time after either such request, <br />OWNER, CONTRACTOR and ENGINEER shall make an inspection of that part of the <br />Work to determine its status of completion. If ENGINEER does not consider that part of <br />the Work to be substantially complete, ENGINEER will notify OWNER and <br />CONTRACTOR in writing giving the reasons therefor. If ENGINEER considers that part <br />of the Work to be substantially complete, the provisions of paragraphs 14.8 and 14.9 will <br />apply with respect to certification of Substantial Completion of that part of the Work and <br />the division of responsibility in respect thereof and access thereto. <br />14.10.2 OWNER may at any time request CONTRACTOR in writing to permit OWNER to take <br />over operation of any such part of the Work although it is not substantially complete. A <br />copy of such request will be sent to ENGINEER and within a reasonable time thereafter <br />OWNER, CON"T"RACTOR and ENGINEER shall make an inspection of that part of the <br />Work to determine its status of completion and will prepare a list of the items remaining to <br />be completed or corrected thereon before final payment. If CONTRACTOR does not object <br />in writing to OWNER and ENGINEER that such part of the Work is not ready for separate <br />operation by OWNER, ENGINEER will finalize the list of items to be completed or <br />corrected and will deliver such list to OWNER, and CONTRACTOR together, with a <br />written iccommendation as to the division of responsibilities pending final payment between <br />OWNER and CONTRACTOR with respect to security, operation, safety, maintenance, <br />utilities, insurance, warranties and guarantees for the part of the Work, which will become <br />binding upon OWNER and CONTRACTOR at (lie time when OWNER takes over such <br />operation (unless they shall have otherwise agreed in writing and so informed ENGINEER). <br />During such operation and prior to Substantial Completion of such part of the Work, <br />OWNER shall allow CONTRACTOR reasonable access to complete or correct items on <br />said list and to complete other related Work. <br />14.10.3 Nr -p occupancy or sepaiaw. uperation ol` part ut t1w Work will be aceompbshed prior to <br />conpiia rc with the requirements of paragraph 5.21 in respect of property insurance. <br />Final Inspection: <br />14.11 Upon written notice from CONTRACTOR that the entire Work or an agreed portion thereof is <br />complete, ENGINEER will make a final inspGrtinra .vith OkVNI:1'. and. CONTRACTOR and will <br />notify CON'rRAC'TOR in writing ofall particulars in which this inspection reveals that the Work <br />is incomplete or c+cferrivt ('rlNT'R,ACTOY sha'1 u.: c ;i: tcly i l.c aucHi rsrcusurer as are necessary <br />to remedy such deficiencies. <br />GENERAL t'ON11iI IONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.