My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-046
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 11:05:00 AM
Creation date
2/13/2024 10:53:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
02/15/2000
Control Number
2000-046
Agenda Item Number
11.G.1.
Entity Name
William Glover, Inc.
Subject
Change Order for Wabasso Causeway Park Improvements
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CI <br />i <br />i <br />r° <br />i 1 Final Application for Payment: <br />! 14.12 After CONTRACTOR has completed all such corrections to the satisfaction of ENGINEER and <br />delivered all maintenance and operating instructions, schedules, guarantees, bonds, certificates of <br />inspection, marked -up record documents (as provided in paragraphs 6.22-6.24) and other <br />documents -all as required by the Contract Documents, and after ENGINEER has indicated that the <br />Work is acceptable (subject to the provisions of paragraph 14.16), CONTRACTOR may make <br />application for final payment following the procedure for progress payments. The final Application <br />for Payment shall be accompanied by all documentation called for in the Contract Documents, <br />together with complete and legally effective releases or waivers (satisfactory to OWNER) of all <br />Liens arising out of or filed in connection with the Work. hi lieu thereof and as approved by <br />OWNER, CONTRACTOR may furnish receipts or releases in full; an affidavit of CONTRACTOR <br />that the releases and receipts include all labor, services, material and equipment for which a Lien <br />could be filed, and that all payrolls, material and equipment bills, and other indebtedness connected <br />with the Work for which OWNER or OWNER's property might in any way be responsible. have <br />i' been paid or otherwise satisfied; and consent of the surety, if any, to final payment. If any <br />i Subcontractor or Supplier fails to furnish a release or receipt in full, CONTRACTOR may furnish <br />a Bond or other collateral satisfactory to OWNER to indemnify OWNER against any Licn. <br />Final Payment and Acceptance. <br />f 14.13 If, on the basis of ENGINEER's observation of the Work during construction and final inspection, <br />! and ENGINEER's review of the final Application for Payment and accompanying documentation -all <br />as required by the Contract Documents, ENGINEER is satisfied that the Work has been completed <br />i and CONTRACTOR's other obligations under the Contract Documents have been fulfilled, <br />ENGINEER will, within ten (16) days after receipt of the final Application for Payment, indicate <br />! in writing ENGINEER's recommendation of payment and present the Application to OWNER for <br />payment. Thereupon ENGINEER will give written notice to OWNER and CONTRACTOR that the <br />f Work is acceptable subject to the provisions of paragraph 14.16. Otherwise, ENGINEER will return <br />the Application to CONTRACTOR, indicating, in writing the reasons for refusing to recommend <br />finaa payment, in which case CONTRACTOR shall make the necessary corrections and resubmit <br />the Application. Thirty (34) days after presentation to OWNER of tite Application and <br />t accompanying documentation, in appropriate form and substance, and with ENGINEER's <br />recommendation and notice of acceptability, the amount recommended by ENGINEER will i. -come <br />due and will be paid by OWNER to CONTRACTOR. <br />14.14 If, through no fault of CONTRACTOR, final completion of the Work is significantly delayed and <br />f if ENGINEER so confirms, OWNER shall, upon receipt of CONfRACI'OR's final application for <br />t Payment and recommendation of ENGINEER, and without terminating the Agreement, make <br />payment of the balance due for that portion of the WUrk fully completed and accepted. If the <br />I remaining balance to be held by OWNER for Work not Bally completed or corrected is less than the <br />t retainage stipulated in the Agreement, and if Bonds have been furnished as required in pantgriph <br />5. 1, the written consent of the =urcty to !h nnvelent (if the halance due Ki. !hat pc01lioll of!h� wo'k <br />fully competed and accepted shall be submitted by CONTRACTOR to E-MANEER with the <br />f' Application for such payment. Such payment shall be made under the terms and [.1—litiamc <br />1- governing iinai payment, except that it shall not constitute a waiver of'clainms. <br />Contractor's Continuing Obligation: <br />14.15 CONTRAC 0R's obligation to pert'ornt and complete the Work in accorduncs with the Contract <br />` Documents shall be absolute. Neither recommendation of ;any 11rnttresr nr fin -A P-,tyment by <br />;,NUINEER, nor the issuance of a certificate of 4ubstantial Completion, nut any p4ymeaat by <br />OWNER to CONTRAC'MR under the ('on!raci I )u urnents, nor any use or occupancy of the Work <br />Lor any part thereof by OWNER, nor any ,act of accclitance by OWNER nor any ]'allure to do so. nor <br />0I NPRAI t' .' ' 0 — <br />QC - 13 <br />L <br />
The URL can be used to link to this page
Your browser does not support the video tag.