Laserfiche WebLink
C� <br />40 <br />C <br />Technical Approach <br />Page 12 <br />ATM will work closely with County staff in generating the mailing list of riparian owners <br />located within 1,000 feet of the proposed line, by accessing the County property <br />appraiser's database. Affidavit of publication in the newspaper with largest local <br />distribution (confirming the notice has been placed for three consecutive weeks prior to <br />the announced date of the workshop/hearing, and once in the Florida Administrative <br />Weekly) shall be furnished to the State promptly. FDEP Bureau of Beaches and Coastal <br />Systems staff, as the designated hearing Officer for the ECL Public Hearing, shall be <br />contacted well in advance of publication by ATM to confirm scheduled availability for this <br />important meeting. <br />ATM will prepare exhibits for and participate in presenting the concept and implications <br />of the ECL to the Public Workshop/Hearing attendees, and shall entertain questions <br />prior to formal Hearing proceedings to ensure the process is understood. Audio <br />recording equipment must be provided by the County to provide a permanent voice <br />record of the proceedings. Since we have conducted this type of presentation for the <br />10 -Mile Longboat Key, Martin County and Mid -Town Beach Restoration Projects, we feel <br />extremely well prepared and experienced in the proper type of presentation format and <br />graphics support. Presentation materials such as these which schematically delineate <br />the project physical and conceptual boundaries are critical to the success of the Public <br />Workshop and, hence, the Public Hearing for the ECL establishment. <br />ATM will ensure the ECL approval schedule is expedited by confirming via frequent <br />telephone contact with the Hearing Officer in the thirty -day comment period following the <br />hearing, that processing is proceeding as anticipated. If it is not, ATM will ascertain <br />whether ATM or County assistance is required, and shall report same to County <br />immediately. <br />Timely submittal of Affidavits and notice copies will assist the Hearing Officer in <br />expeditious processing of the ECL and subsequent forwarding to the FDEP Bureau of <br />Surveying and Mapping for final approval. We will complete our obligations to the <br />County with regard to ECL processing by ensuring that the approved line is properly <br />recorded in Indian River County as a permanent record of the established boundary of <br />state-owned lands. <br />TASK 13 PREPARE AND ACQUIRE CONSTRUCTION EASEMENTS <br />Construction Easement <br />ATM will work cooperatively with the County and municipal governments to prepare legal <br />descriptions and easement language for acquisition of easements from affected riparian <br />owners within the project fill limits in Sectors 1, 2 and 3 (approximately 145 parcels). <br />The following legal instruments will be required prior to construction: <br />• Consent of Use Easement for the Central and South borrow areas; <br />• Temporary Beach Nourishment and Work Area Easements and, <br />• Temporary Access Road Easement. <br />