My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-028
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 2:23:02 PM
Creation date
2/15/2024 2:20:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/23/2024
Control Number
2024-028
Agenda Item Number
8.Z.
Entity Name
State of Florida Division of Emergency Services
Mitigation Bureau (FDEM)
Subject
Modification of Contract #H0259
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />RYAN L. BUTLER, CLERK <br />gg. Avoid heavy equipment operation (except for prescribed burning and related activities) within 400 <br />feet of active, known and visibly apparent Florida sandhill crane nests from February through May. <br />9. Source of condition: NEPA Determination, Monitoring Required: No <br />hh. For southeast American kestrels, leave standing snags where they do not pose a safety issue, as <br />per the Silviculture BMP Manual as incorporated in Rule 51-6.002 F.A.C., and avoid damaging or <br />felling known nest trees. Source of condition: NEPA Determination, Monitoring Required: No <br />ii. Avoid prolonged heavy equipment operation (generally in excess of one day), except for prescribed <br />burning and related activities, within 490 feet of active, known and visibly apparent kestrel nests <br />from March through June. Source of condition: NEPA Determination, Monitoring Required: No <br />jj. Schedule all vegetation removal, trimming, and grading of vegetated areas outside of the peak bird <br />breeding season to the maximum extent practicable. Use available resources, such as internet- <br />based tools (e.g., the FWS�s Information, Planning and Conservation System, Avian Knowledge <br />Network, or the county's existing biological profiles) to identify peak breeding months for local bird <br />species; or, contact local Service Migratory Bird Program Office for breeding bird information. <br />Source of condition: NEPA Determination, Monitoring Required: No <br />kk. When project activities cannot occur outside the bird nesting season, conduct surveys prior to <br />scheduled activity to determine if active nests are present within the area of impact and buffer any <br />nesting locations found during surveys. Source of condition: NEPA Determination, Monitoring <br />Required: No <br />II. Prepare a vegetation maintenance plan that outlines vegetation maintenance activities and <br />schedules so that direct bird impacts do not occur. Source of condition: NEPA Determination, <br />Monitoring Required: No <br />mm. No open burning would occur. All vegetative debris associated with the project must be <br />disposed of properly and not placed in identified floodway or wetland areas. Source of condition: <br />NEPA Determination, Monitoring Required: No <br />nn. Construction noise levels would be minimized by ensuring that construction equipment is equipped <br />with a recommended muffler in good working order. Source of condition: NEPA Determination, <br />Monitoring Required: No <br />oo. Impact to noise levels would be minimized by limiting construction activities that occur to between <br />7 a.m. and 5 p.m. Source of condition: NEPA Determination, Monitoring Required: No <br />pp. Utilities should be located before construction and coordination with local utility companies may <br />need to occur. If planned outages are necessary, utility customers should be given advanced <br />notice. Source of condition: NEPA Determination, Monitoring Required: No <br />qq. Workers should use appropriate Personal Protective Equipment (PPE) and follow applicable <br />Occupational Safety and Health Administration (OSHA) standards and procedures. Source of <br />condition: NEPA Determination, Monitoring Required: No <br />rr. Work areas should be clearly marked with appropriate signage and secured against unauthorized <br />entry. Source of condition: NEPA Determination, Monitoring Required: No <br />ss. Standard construction traffic control measures should be used to protect workers, residents, and <br />the travelling public. Source of condition: NEPA Determination, Monitoring Required: No <br />This is FEMA project number 4283-095-R. It is funded under HMGP, FEMA -4283 -DR -FL and must adhere <br />to all program guidelines established for the HMGP in accordance with the PAS Operational Agreement <br />for Disaster 4283. <br />FEMA awarded this project on June 17, 2019; with a Pre -Award date of January 30, 2018; this Agreement <br />was executed on October 10, 2019, and the Period of Performance for this project shall end on July 31, <br />2024. <br />F) FINANCIAL CONSEQUENCES: <br />If the Sub -Recipient fails to comply with any term of the award, the Division shall take one or more of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.