Laserfiche WebLink
IRC -2001 <br />SECTION 00942 — Change Order Form <br />DATE OF ISSUANCE: 1/23/2024 <br />No. 1 <br />EFFECTIVE DATE: 1/23/2024 <br />OWNER: Indian River County <br />CONTRACTOR Dickerson Infrastructure Inc. dba Dickerson Florida Inc <br />Project: 11TH DRIVE & 37TH STREET ROADWAY AND INTERSECTION <br />IMPROVEMENTS <br />OWNER's Project No. IRC -2001 OWNER'S Bid No. 2023009 <br />You are directed to make the following changes in the Contract Documents: <br />Description: Furnish and Install light poles and all associated items per lighting plans dated 11/6/23, <br />install a 6" line stop with an isolation valve, remove segment of existing 8" water main in conflict by <br />elevation with new proposed road, reconstruct a new 8"' watermain at a depth to satisfy proper cover <br />requirements of Utility Department minimum standards. <br />Reason for Change Order: This change order provides full compensation and time to the Contractor for <br />all work, materials, and tabor as detailed above, <br />Attachments: <br />Lighting Plans signed dated 11/6/23 <br />Contractor Quote No. 5 dated 10/26/2023- 8" County watermain relocation $47,868.00 <br />Contractor Quote No. 1 dated 12/21/2023 — lighting $133,142.94 <br />Contractor Quote No. 6 dated 12/19/2023 - line stop and isolation valve $21,825.34 <br />CHANGE IN CONTRACT PRICE: <br />Description <br />Amount <br />Original Contract Price <br />$3,478,155.50 <br />Net increase of this Change <br />Order: <br />$202,836.28 <br />Contract Price with all <br />approved Change Orders: <br />$3,680,991.78 <br />CONTRACTUR (Signature) <br />Date: 1�,9- -� 0,1 q <br />CHANGE IN CONTRACT TIMES <br />Description <br />Time <br />Original Contract Time: <br />(days) <br />Substantial Completion: <br />240 <br />Final Completion: <br />270 <br />Net increase this Change Order: <br />(days) <br />Substantial Completion: <br />120 days <br />Final Completion: <br />120 days <br />Contract Time with all approved <br />Change Orders: <br />(days) <br />Substantial Completion: <br />360 <br />Final Completion: <br />390 <br />RECOMMENDED: <br />Rob Skok y <br />By: <br />PROJECT MANAGER (Signature) <br />Date: <br />APPROVED: <br />Kirstin <br />By: <br />Leiendecker, <br />OWNER (Signature) <br />Date: <br />Change Order Form — 00942 <br />F:1Puldic WorksIENGINEERING DIVISION PROJECTSV001 11th Dr and 37th St Intersection Improvemntsit-Adrmn\Agenda Items\Change Orders=IIJRC-2001 COt 2024D123.doex <br />