December 21, 2023
<br />Mr, Robert S. Skok
<br />Infrastructure Project Manager, IRC Engineering
<br />IRC Engineering
<br />1801 27th Street
<br />Vero Beach, FL. 32960-3388
<br />RE: 11th Drive & 37th Street Roadway and Intersection Improvements
<br />Project No. IRC -2001
<br />Vero Beach, Florida
<br />Change Order Proposal #1 revised
<br />Subject: Proposal for revised lighting plans per WCD #1,
<br />DICKERSON
<br />FLORIDA, INC,
<br />A COMPANY OF THE DICKERSON GROUP, INC.
<br />PO Box 910
<br />Fort Pierce, FL 34954-0910
<br />phone 772-429-4444
<br />fax 772-429-4445
<br />Note: Subcontractor proposal attached.
<br />Lead time on light pole procurement is 18 weeks.
<br />Sincerely,
<br />Dickerson FL, Inc.
<br />Joi� L PLwwct�
<br />John L. Pluswick
<br />ITEM NO. I DESCRIPTION
<br />QTY
<br />UNIT
<br />UNIT PRICE
<br />TOTAL
<br />IDelete Contract Items:
<br />0715 4 50 Light pole complete, install
<br />(8)
<br />EA
<br />$5,000.00
<br />($40,000.00)
<br />Add Contract Items:
<br />1
<br />0630 2 11 Conduit, F&I, open trench
<br />110
<br />LF
<br />$17,00
<br />$1,870.00
<br />0630 2 12, Lighting Conduit, F&I, directional bore
<br />735
<br />LF
<br />$15.86
<br />$11,657,10
<br />06352 11 Lighting pull & splice box, F&I, 13" x 24" cover size
<br />9
<br />EA
<br />$2.035.95
<br />$18,323.55
<br />06391 122 Electrical power service, F&I, underground, meter purchase by
<br />contractor
<br />1
<br />AMBY
<br />$5,429.55
<br />$5,429,55
<br />0715 1 12 Lighting conductors, F&I, insulated, no. 8 - 6
<br />5367
<br />LF
<br />$2,52
<br />$13,524.84
<br />07154 131 Light pole complete, F&I, standard pole, standard foundation, 40'
<br />mounting height
<br />8
<br />EA
<br />$11,610.90
<br />$92,887.20
<br />0715 500 1 Pole cable distribution system, conventional
<br />8
<br />EA
<br />$828.45
<br />$6,627,60
<br />07157 11 Load center, F&I, secondary voltage
<br />1
<br />EA
<br />$16,823.10
<br />$16,82110
<br />101-1 Added prime contractor supervision w/pickup
<br />10
<br />DAYS
<br />$600,00
<br />$6,000,00
<br />Total
<br />$133,142.94
<br />Note: Subcontractor proposal attached.
<br />Lead time on light pole procurement is 18 weeks.