Laserfiche WebLink
December 21, 2023 <br />Mr, Robert S. Skok <br />Infrastructure Project Manager, IRC Engineering <br />IRC Engineering <br />1801 27th Street <br />Vero Beach, FL. 32960-3388 <br />RE: 11th Drive & 37th Street Roadway and Intersection Improvements <br />Project No. IRC -2001 <br />Vero Beach, Florida <br />Change Order Proposal #1 revised <br />Subject: Proposal for revised lighting plans per WCD #1, <br />DICKERSON <br />FLORIDA, INC, <br />A COMPANY OF THE DICKERSON GROUP, INC. <br />PO Box 910 <br />Fort Pierce, FL 34954-0910 <br />phone 772-429-4444 <br />fax 772-429-4445 <br />Note: Subcontractor proposal attached. <br />Lead time on light pole procurement is 18 weeks. <br />Sincerely, <br />Dickerson FL, Inc. <br />Joi� L PLwwct� <br />John L. Pluswick <br />ITEM NO. I DESCRIPTION <br />QTY <br />UNIT <br />UNIT PRICE <br />TOTAL <br />IDelete Contract Items: <br />0715 4 50 Light pole complete, install <br />(8) <br />EA <br />$5,000.00 <br />($40,000.00) <br />Add Contract Items: <br />1 <br />0630 2 11 Conduit, F&I, open trench <br />110 <br />LF <br />$17,00 <br />$1,870.00 <br />0630 2 12, Lighting Conduit, F&I, directional bore <br />735 <br />LF <br />$15.86 <br />$11,657,10 <br />06352 11 Lighting pull & splice box, F&I, 13" x 24" cover size <br />9 <br />EA <br />$2.035.95 <br />$18,323.55 <br />06391 122 Electrical power service, F&I, underground, meter purchase by <br />contractor <br />1 <br />AMBY <br />$5,429.55 <br />$5,429,55 <br />0715 1 12 Lighting conductors, F&I, insulated, no. 8 - 6 <br />5367 <br />LF <br />$2,52 <br />$13,524.84 <br />07154 131 Light pole complete, F&I, standard pole, standard foundation, 40' <br />mounting height <br />8 <br />EA <br />$11,610.90 <br />$92,887.20 <br />0715 500 1 Pole cable distribution system, conventional <br />8 <br />EA <br />$828.45 <br />$6,627,60 <br />07157 11 Load center, F&I, secondary voltage <br />1 <br />EA <br />$16,823.10 <br />$16,82110 <br />101-1 Added prime contractor supervision w/pickup <br />10 <br />DAYS <br />$600,00 <br />$6,000,00 <br />Total <br />$133,142.94 <br />Note: Subcontractor proposal attached. <br />Lead time on light pole procurement is 18 weeks. <br />Sincerely, <br />Dickerson FL, Inc. <br />Joi� L PLwwct� <br />John L. Pluswick <br />