To:
<br />Corporate Office
<br />Local Offices
<br />Rick Forlifer
<br />242 North Westmonte Drive
<br />3340 Southeast Dixie Highway
<br />Phone:
<br />V TRAFFIC
<br />Altamonte Springs, FL 32744 i
<br />Altamonte Springs, FL
<br />CONTROL"����
<br />���°��
<br />Deland, FL
<br />Groveland FL
<br />Tampa, FL
<br />Dallas, TX
<br />DEVICES, LLG
<br />Phone - 407.869.6300
<br />Jacksonville, FL
<br />Houston, TX
<br />Bid Date:
<br />Fax -407.682.0076
<br />Port St. Lucie, FL
<br />Punta Gorda, FL
<br />San Antonio, TX
<br />Salisbury, NC
<br />Unit Price Total Price
<br />$6,312.00
<br />Rockledge, FL
<br />EACH
<br />$16,022.00
<br />vvww,TCD-USA.cam
<br />To:
<br />Dickerson Florida, Inc.
<br />Contact:
<br />Rick Forlifer
<br />Address:
<br />3340 Southeast Dixie Highway
<br />Phone:
<br />(772) 429-4444
<br />METER PURCHASED BY CONTRACTOR
<br />Stuart, FL 34995
<br />Fax:
<br />1 (772) 429-4445
<br />Project Name:
<br />23015000-03 Indian River Co. 11th Drive And 37th St - Lighting
<br />Bid Number:
<br />2023009
<br />Project Location:
<br />11th Drive And 37th Street, Gifford, FL
<br />Bid Date:
<br />12/18(2023
<br />Item # Item Description Estimated Quantity
<br />Unit
<br />Unit Price Total Price
<br />1. Overrun/ Underrun Contract Items
<br />0630 2 11 CONDUIT, F&I, OPEN TRENCH
<br />0715 450 LIGHT POLE COMPLETE, INSTALL
<br />110.00 LF $15,00 $1,650.00
<br />-8.00 EACH $4,607.00 ($36,856.00)
<br />Total Price for above 1. Overrun/Underrun Contract Items Items: ($35,206.00)
<br />2. New Items
<br />0630 2 12
<br />CONDUIT, F&I, DIRECTIONAL BORE
<br />0635 2 11
<br />PULL & SPLICE BOX, F&I, 13" X 24" COVER SIZE
<br />0639 1 122
<br />ELECTRICAL POWER SERVICE, F&I, UNDERGROUND,
<br />$17,451.00
<br />METER PURCHASED BY CONTRACTOR
<br />0715 1 12
<br />LIGHTING CONDUCTORS, F&I, INSULATED, NO.8 - 6
<br />0715 4 13
<br />LIGHT POLE COMPLETE, F&I STANDARD POLE STANDARD
<br />LF
<br />FOUNDATION, 40' MOUNTING HEIGHT
<br />0715 500 1
<br />POLE CABLE DISTRIBUTION SYSTEM, CONVENTIONAL
<br />0715 7 11
<br />LOAD CENTER, F&I, SECONDARY VOLTAGE
<br />735.00
<br />LF
<br />$15.10
<br />$11,098.50
<br />9.00
<br />EACH
<br />$1,939.00
<br />$17,451.00
<br />1.00
<br />AMBY
<br />$5,171.00
<br />$5,171.00
<br />5,367.00
<br />LF
<br />$2.40
<br />$12,880.80
<br />8.00
<br />EACH
<br />$11,058.00
<br />$88,464.00
<br />8.00
<br />EACH
<br />$789.00
<br />$6,312.00
<br />1.00
<br />EACH
<br />$16,022.00
<br />$16,022.00
<br />Total Price for above 2. New Items Items: $157,399.30
<br />Total Bid Price: $122,193.30
<br />Notes:
<br />This proposal is a unit price proposal. The total sum is an approximate sum based on the estimated quantities on the attached proposal (which is an
<br />integral part of this proposal) at the unit prices depicted thereon. The final contract amount of any contract resulting from this proposal shall be
<br />based on the quantities actually installed and field verified by the Owner's architect/engineer at these unit prices.
<br />Our price includes Insurance.
<br />All work is guaranteed to be installed in accordance with the latest applicable Code regulations, and to be free from mechanical and electrical
<br />defects for one year from the date of acceptance.
<br />` All Maintenance of Traffic shall be provided by others.
<br />' No items quoted herein may be "broken out" without prior approval in writing.
<br />• All survey & layout work is to be performed by others.
<br />This proposal is valid for thirty (30) days from bid date.
<br />' All QC managers, plans or testing (if required) shall be provided by others and is not included in this proposal.
<br />• Asphalt, Concrete Sidewalk and Sodding removal and placement shall be provided by others.
<br />• Electrical permit fees included in this proposal for electrical services associated with TCD work only. All other permits or fees shall be provided by
<br />others.
<br />• Per Section 611-2.3 (As -Built Drawings) of the FDOT Standard Specifications for Road and Bridge Construction, we have included the cost of
<br />providing the as -built plans for the signalization portion of the work. However, we are excluding the cost to sign & seal these as -built drawings. The
<br />cost to sign & seal the as -built drawings, as well as all required survey, shall be the responsibility of the General Contractor.
<br />• This proposal is based on TCD be allowed to perform all drilled shaft installations during the daytime hours. We have not included any concrete
<br />plant opening fees. If drilled shafts need to be installed after hours, there will be an additional charge for the concrete plant opening fees.
<br />• TCD reserves the right to negotiate mutually agreeable terms and conditions before entering in to an agreement.
<br />12/18/2023 9:11:15 AM Page 1 of 2