Laserfiche WebLink
To: <br />Corporate Office <br />Local Offices <br />Rick Forlifer <br />242 North Westmonte Drive <br />3340 Southeast Dixie Highway <br />Phone: <br />V TRAFFIC <br />Altamonte Springs, FL 32744 i <br />Altamonte Springs, FL <br />CONTROL"���� <br />���°�� <br />Deland, FL <br />Groveland FL <br />Tampa, FL <br />Dallas, TX <br />DEVICES, LLG <br />Phone - 407.869.6300 <br />Jacksonville, FL <br />Houston, TX <br />Bid Date: <br />Fax -407.682.0076 <br />Port St. Lucie, FL <br />Punta Gorda, FL <br />San Antonio, TX <br />Salisbury, NC <br />Unit Price Total Price <br />$6,312.00 <br />Rockledge, FL <br />EACH <br />$16,022.00 <br />vvww,TCD-USA.cam <br />To: <br />Dickerson Florida, Inc. <br />Contact: <br />Rick Forlifer <br />Address: <br />3340 Southeast Dixie Highway <br />Phone: <br />(772) 429-4444 <br />METER PURCHASED BY CONTRACTOR <br />Stuart, FL 34995 <br />Fax: <br />1 (772) 429-4445 <br />Project Name: <br />23015000-03 Indian River Co. 11th Drive And 37th St - Lighting <br />Bid Number: <br />2023009 <br />Project Location: <br />11th Drive And 37th Street, Gifford, FL <br />Bid Date: <br />12/18(2023 <br />Item # Item Description Estimated Quantity <br />Unit <br />Unit Price Total Price <br />1. Overrun/ Underrun Contract Items <br />0630 2 11 CONDUIT, F&I, OPEN TRENCH <br />0715 450 LIGHT POLE COMPLETE, INSTALL <br />110.00 LF $15,00 $1,650.00 <br />-8.00 EACH $4,607.00 ($36,856.00) <br />Total Price for above 1. Overrun/Underrun Contract Items Items: ($35,206.00) <br />2. New Items <br />0630 2 12 <br />CONDUIT, F&I, DIRECTIONAL BORE <br />0635 2 11 <br />PULL & SPLICE BOX, F&I, 13" X 24" COVER SIZE <br />0639 1 122 <br />ELECTRICAL POWER SERVICE, F&I, UNDERGROUND, <br />$17,451.00 <br />METER PURCHASED BY CONTRACTOR <br />0715 1 12 <br />LIGHTING CONDUCTORS, F&I, INSULATED, NO.8 - 6 <br />0715 4 13 <br />LIGHT POLE COMPLETE, F&I STANDARD POLE STANDARD <br />LF <br />FOUNDATION, 40' MOUNTING HEIGHT <br />0715 500 1 <br />POLE CABLE DISTRIBUTION SYSTEM, CONVENTIONAL <br />0715 7 11 <br />LOAD CENTER, F&I, SECONDARY VOLTAGE <br />735.00 <br />LF <br />$15.10 <br />$11,098.50 <br />9.00 <br />EACH <br />$1,939.00 <br />$17,451.00 <br />1.00 <br />AMBY <br />$5,171.00 <br />$5,171.00 <br />5,367.00 <br />LF <br />$2.40 <br />$12,880.80 <br />8.00 <br />EACH <br />$11,058.00 <br />$88,464.00 <br />8.00 <br />EACH <br />$789.00 <br />$6,312.00 <br />1.00 <br />EACH <br />$16,022.00 <br />$16,022.00 <br />Total Price for above 2. New Items Items: $157,399.30 <br />Total Bid Price: $122,193.30 <br />Notes: <br />This proposal is a unit price proposal. The total sum is an approximate sum based on the estimated quantities on the attached proposal (which is an <br />integral part of this proposal) at the unit prices depicted thereon. The final contract amount of any contract resulting from this proposal shall be <br />based on the quantities actually installed and field verified by the Owner's architect/engineer at these unit prices. <br />Our price includes Insurance. <br />All work is guaranteed to be installed in accordance with the latest applicable Code regulations, and to be free from mechanical and electrical <br />defects for one year from the date of acceptance. <br />` All Maintenance of Traffic shall be provided by others. <br />' No items quoted herein may be "broken out" without prior approval in writing. <br />• All survey & layout work is to be performed by others. <br />This proposal is valid for thirty (30) days from bid date. <br />' All QC managers, plans or testing (if required) shall be provided by others and is not included in this proposal. <br />• Asphalt, Concrete Sidewalk and Sodding removal and placement shall be provided by others. <br />• Electrical permit fees included in this proposal for electrical services associated with TCD work only. All other permits or fees shall be provided by <br />others. <br />• Per Section 611-2.3 (As -Built Drawings) of the FDOT Standard Specifications for Road and Bridge Construction, we have included the cost of <br />providing the as -built plans for the signalization portion of the work. However, we are excluding the cost to sign & seal these as -built drawings. The <br />cost to sign & seal the as -built drawings, as well as all required survey, shall be the responsibility of the General Contractor. <br />• This proposal is based on TCD be allowed to perform all drilled shaft installations during the daytime hours. We have not included any concrete <br />plant opening fees. If drilled shafts need to be installed after hours, there will be an additional charge for the concrete plant opening fees. <br />• TCD reserves the right to negotiate mutually agreeable terms and conditions before entering in to an agreement. <br />12/18/2023 9:11:15 AM Page 1 of 2 <br />