My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/23/2024
CBCC
>
Meetings
>
2020's
>
2024
>
01/23/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 11:09:25 AM
Creation date
2/26/2024 9:58:39 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/23/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
549
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Changes to dune conditions since original designs were completed in the fall of 2023 may <br />require both additional design costs, and changes to material quantities for the north and <br />middle dune crossovers. Additionally, the bid documents anticipated a notice to proceed <br />on February 1, 2024, however, permits are not expected to be approved prior to the <br />beginning of sea turtle nesting season, which runs from March 1, 2024 through October 31, <br />2024, and during which no construction may take place. The delay in the commencement <br />of construction could lead to a potential increase in material costs. <br />In order to ensure successful reconstruction of at least the southern, most -highly utilized <br />boardwalk, staff suggests the Board authorize the Administrator to exclude one or both of <br />the northern crossings from the current project, if necessary, after coordination with the <br />contractor, Federal Emergency Management Agency (FEMA), and the Florida Department <br />of Environmental Protection (FDEP). Staff anticipates the contractor will be able to <br />complete the demolition portion of the southern crossing prior to, or during the early, less - <br />active, turtle nesting period, and construction of the new southern crossing to commence <br />November 1, 2024. If conditions and prices are stable through turtle nesting season, and <br />the two northern crossings can be constructed as bid, staff would plan to move forward <br />with them beginning November 1, 2024, as well. <br />Base bid pricing submitted by Island Harbor Custom Builders was: <br />Item <br />Description <br />Total <br />1a <br />Mobilization and Demobilization <br />$10,000 <br />2 <br />North Dune Crossover — Construction <br />$55,600 <br />3 <br />Middle Dune Crossover — Construction <br />$61,000 <br />4a <br />Segment of South Dune Crossover — Demolition <br />$8,000 <br />4b <br />Segment of South Dune Crossover — Construction <br />$26,400 <br />5 <br />Site Restoration <br />$20,000 <br />Total Bid <br />$18i,000 <br />Alternate Bid Items <br />Unit <br />Unit <br />Quantity <br />Toltal <br />Remove, Dispose, Provide and Install Existing <br />$15 <br />LF <br />480 <br />$x,200 <br />Deck Boards with New 2"x6" Deck Board <br />Remove, Dispose Provide and Install Existing <br />$28 <br />LF <br />210 <br />$5,880 <br />Stringer Boards with New 2"x10" Stringer Boards <br />Remove, Dispose Provide and Install Existing <br />$35 <br />LF <br />24 <br />$840 <br />Pile Cap Boards with New 2"x12" Pile Cap Boards <br />Replace Existing 20400t long 6 -inch Square Pile <br />with New 6 -inch Square Pile including disposal <br />$600 <br />EA <br />4 <br />$2,400 <br />(Removal and Installation already paid under <br />Items 4a and 4b, above) <br />*'Sum of Alternates <br />$16,320 <br />* indicates mathematical errors made on the bid form in summary of total sum <br />90 <br />