My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-017A
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-017A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 11:30:56 AM
Creation date
2/26/2024 11:25:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/09/2024
Control Number
2024-017A
Agenda Item Number
15.B.3.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order No. 5 for Annual Permit, Compliance Monitoring and Reporting for 2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />20 December 2023 <br />Page 9 <br />210.370(3), F.A.C. As part of this task, Geosyntec will perform calculations to estimate <br />the annual emission rates of non -methane organic compounds (NMOCs) and VOCs from <br />the LFG to determine if the facility designation has changed from voluntary to mandatory <br />with regard to operation and reporting requirements of the active GCCS under the New <br />Source Performance Standards (NSPS) requirements. The results of the annual LFG <br />sulfur content test will be used in the EAOR calculations. In the event of a status change, <br />Geosyntec will advise the SWDD of its implications. <br />• Semi -Annual Monitoring Report: Geosyntec will prepare and submit two semi-annual <br />monitoring reports to demonstrate compliance with the federal requirements of the Title <br />V permit. The reports will address the following permit conditions or compliance <br />requirements: <br />o Submittal of reports of any required monitoring at least every 6 months. All instances <br />of deviations from permit requirements must be clearly identified in such reports. <br />o Reporting, in accordance with requirements of subsection 62-210.700(6) and Rule 62- <br />4.130, F.A.C., of deviations from permit requirements, including those attributable to <br />upset conditions defined in the permit. Reports shall include the probable cause of <br />such deviations, and any corrective actions or preventative measures taken. <br />o Reports shall be accompanied by a responsible official, pursuant to subsection 62- <br />213.420(4), F.A.C. <br />The reports will only address deviations from the Title V permit conditions. Landfill and <br />LFG operation and maintenance (O&M) data are not required to be reviewed and <br />submitted to the FDEP per the Title V permit. <br />• Annual Title V Emissions Fee: The EAOR application used for reporting to the FDEP <br />will automatically calculate the annual emission fee for the facility. Geosyntec will <br />notify the SWDD of the fee amount and will submit the check for payment of the fee on <br />behalf of the SWDD prior to the April 1 deadline. <br />• Annual LFG Sulfur Content Test: Geosyntec will collect three samples of LFG <br />annually to determine the sulfur content in accordance with ASTM Method D5504-12 or <br />D7493. The samples will be tested by a certified air testing laboratory. The laboratory <br />test results will be used to calculate sulfur emissions and a report prepared for submittal <br />to the FDEP. The LFG sulfur content testing will be completed no later than 31 <br />December 2024, and the corresponding reporting will be completed no later than 45 days <br />after testing. <br />NCP2323548/JL23073 2024 Compliance Monitoring Proposal <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.