My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-017A
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-017A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 11:30:56 AM
Creation date
2/26/2024 11:25:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/09/2024
Control Number
2024-017A
Agenda Item Number
15.B.3.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order No. 5 for Annual Permit, Compliance Monitoring and Reporting for 2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />20 December 2023 <br />Page 8 <br />For the C&D debris disposal facility, the quarterly assessment monitoring samples (including <br />those collected in January and July) will be analyzed for the routine monitoring parameters listed <br />in Paragraph 8 of the WQMP (C&D Permit) plus arsenic and benzene. <br />For the Class I landfill, the quarterly assessment groundwater monitoring samples will be <br />sampled for parameters as required by subparagraph 62-701.510(6)(a)3, F.A.C. The surface <br />water samples will be screened for field parameters. <br />Geosyntec will assist the SWDD in coordinating the analytical testing activities with Eurofins, <br />notify the FDEP prior to sampling as required by the WQMP, review and evaluate the analytical <br />test results, and prepare a letter report for each quarterly assessment monitoring event. <br />The letter reports will be submitted in draft forms to the SWDD for review and comment and <br />will be finalized, with the SWDD's comments implemented, for submittal to the FDEP. Any <br />changes to the monitoring and reporting requirements that might be requested by the FDEP <br />based on the results of the quarterly assessment monitoring will be performed under Phase 5 <br />below. <br />Phase 4 — Storage Tank Monitoring Well Sampling and Reporting <br />In accordance with Table 2 of the Order, Geosyntec will assist the SWDD with quarterly <br />monitoring of well associated with the leachate storage tank, analytical testing by Eurofins under <br />direct contract to the SWDD, and preparation of the first semi-annual and annual summary report <br />for submittal to the FDEP. <br />Phase 5 — Title V Permit Compliance and Reporting <br />Geosyntec will assist the SWDD in complying with the operation, monitoring, and reporting <br />requirements for of the active landfill gas collection and control system (GCCS) under the <br />current Title V Air Operation Permit No. 0610015 -008 -AV. The following permit compliance <br />support services will be provided: <br />• Statement of Compliance: Geosyntec will prepare and submit the annual Statement <br />of Compliance for the Class I Landfill. This compliance document must be submitted to <br />the FDEP within 60 days after the end of the calendar year, as required by subparagraph <br />62-213.440(3)(a)(2), F.A.C. <br />• Electronic Annual Operating Report (EAOR): Geosyntec will prepare and submit to <br />the FDEP the EAOR for the Class I landfill for the calendar year 2023. This report be <br />submitted on or before April 1 of each calendar year, as required by subsection 62- <br />NCP2323548/JL23073_2024 Compliance Monitoring Proposal <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.