My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-017A
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-017A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 11:30:56 AM
Creation date
2/26/2024 11:25:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/09/2024
Control Number
2024-017A
Agenda Item Number
15.B.3.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order No. 5 for Annual Permit, Compliance Monitoring and Reporting for 2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />20 December 2023 <br />Page 7 <br />The laboratory analytical testing will be conducted by Eurofins testing laboratory. The samples <br />collected from the Class I landfill monitoring wells will be analyzed for the routine monitoring <br />parameters listed in paragraph 7 of the WQMP and in accordance with paragraph 62- <br />701.510(5)(c) & (7)(a), F.A.C. The samples collected from the C&D debris disposal facility <br />monitoring wells, with the exception of the quarterly assessment wells, will be analyzed for the <br />routine monitoring parameters listed in paragraph 8 of the WQMP and in accordance with 62- <br />701.739(8)(d), F.A.C. The samples from the surface water site (SW -2) will be analyzed for the <br />list of parameters listed in Section III.2 of the Class I Landfill WQMP, as required by paragraphs <br />62-701.510 (5)(d) and (7)(b), F.A.C. Geosyntec will assist the SWDD in coordinating the <br />analytical testing activities with Eurofins, notify the FDEP prior to sampling as required by the <br />WQMP, review and evaluate the analytical test results, and prepare the semi-annual reports. <br />The results of water -quality sampling under the WQMP will be presented in a report supported <br />by attachments containing chain -of -custody sheets, field notes and observations, water sampling <br />logs, maps, analytical results, and any other applicable materials. The reports will include <br />groundwater completion report form and groundwater elevation contour map, both signed and <br />sealed by a Florida registered professional engineer. These reports will be submitted to the <br />SWDD for review prior to submittal to the FDER The reports (in Adobe format) and analytical <br />data Electronic Data Deliverable (EDD) will be submitted electronically to the FDEP using the <br />ADaPT software in accordance with Section V.E of the WQMP. According to the WQMP, <br />monitoring test results shall be submitted to the FDEP within 60 days from completion of <br />laboratory analyses. <br />Phase 3 — Ouarterly Assessment Monitoring and Reporting (Both C&D Debris Disposal <br />Facility and Class I Landfill) <br />Geosyntec will perform quarterly sampling events for Calendar Year 2024 (January, April, July, <br />and October) of five (5) groundwater wells (MW -21S, MW -49S, MW -50S, MW -51S, and MW - <br />52S) and four (4) surface water sample sites (SW -LCI, SW-LC3, LC-SW4, and LC-SW6) for <br />the C&D debris disposal facility and at seven (7) groundwater monitoring wells (MW -3S, MW - <br />14S, MW -44S, MW -44I, MW -53S, MW -54S, and MW -54I) and four (4) surface water samples <br />(C5 -SWI, SW -MW -14S, SW -MW -53S, and SW -MW -54S) for the Class I landfill. <br />The January and July sampling will be performed as part of the semi-annual sampling program <br />under Phase 2 for the C&D debris disposal facility and assumed to take three (3) additional days <br />to complete. The April and October data collection and sampling will each take four (4) days to <br />complete. Geosyntec will deliver the samples to Eurofins laboratory for analytical testing under <br />the SWDD's contract (i.e., Eurofins will directly invoice the SWDD for laboratory charges). <br />NCP2323548/JL23073 2024 Compliance Monitoring Proposal <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.