My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-017A
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-017A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 11:30:56 AM
Creation date
2/26/2024 11:25:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/09/2024
Control Number
2024-017A
Agenda Item Number
15.B.3.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order No. 5 for Annual Permit, Compliance Monitoring and Reporting for 2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />20 December 2023 <br />Page 6 <br />• Phase 1 — General Consulting/Meeting Support/Project Management; <br />• Phase 2 — Semi -Annual Sampling and Reporting; <br />• Phase 3 — Quarterly Assessment Monitoring and Reporting; <br />• Phase 4 — Storage Tank Groundwater Monitoring Well Sampling and Reporting; <br />• Phase 5— Title V Permit Compliance and Reporting; and <br />• Phase 6 — Technical and Miscellaneous Permit Compliance Support and Reporting. <br />The above scope of services is based on current regulations and reporting requirements for the <br />IRCL facility as previously discussed above. An amendment to this scope of services may be <br />needed should there be any regulatory changes that result in additional work. The remainder of <br />this section presents a general description of the activities to be performed in each phase. <br />Phase 1— General Consulting/Meeting Support/Project Management <br />Under this phase, Geosyntec will perform project planning and management responsibilities, <br />such as correspondence with the SWDD and FDEP, invoice review, project coordination, and <br />project administration. Geosyntec has also included budget for preparation and attendance (by <br />two Geosyntec personnel) at one meeting with the SWDD and/or FDEP, as needed. <br />Phase 2 — Semi -Annual Sampling and Reporting <br />Geosyntec will assist the SWDD to perform the semi-annual sampling and prepare the water - <br />quality monitoring reports as required by the WQMP. Geosyntec will assist the SWDD with <br />conducting all field sampling preparation activities, including scheduling, staffing, <br />subcontracting, and field equipment preparation. Prior to collecting the groundwater samples in <br />January and July 2024, Geosyntec will perform water -level measurements from the Site <br />monitoring well network and installed staff gauges adjacent to the Site. Geosyntec will then <br />perform semi-annual sampling of the Class I landfill and C&D debris disposal facility <br />groundwater monitoring wells in January (34 wells) and July (25 wells) of 2024. We will also <br />perform semi-annual (January and July) sampling of the surface water site (SW -2) if it is <br />discharging from the stormwater pond. <br />It is estimated that data collection and sampling will take five (5) full days in January and four <br />(4) full days in July for the semi-annual monitoring and reporting for the Class I landfill and <br />C&D debris disposal facility. Geosyntec will deliver the samples to Eurofins laboratory for <br />analytical testing under the SWDD's contract (i.e., Eurofins laboratory will directly invoice the <br />SWDD). <br />NCP2323548/JL23073 2024 Compliance Monitoring Proposal <br />rmgineers I scientists ! innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.