My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-017A
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-017A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 11:30:56 AM
Creation date
2/26/2024 11:25:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/09/2024
Control Number
2024-017A
Agenda Item Number
15.B.3.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order No. 5 for Annual Permit, Compliance Monitoring and Reporting for 2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />20 December 2023 <br />Page 5 <br />requirements; (iv) compliance with MSGP permit requirements; and (v) other technical and <br />miscellaneous permit compliance support services that may be required by the SWDD in 2024. <br />Title V Air Operation Permit Compliance <br />The SWDD was issued a Title V Air Operation renewal permit (Permit No. 0610015 -008 -AV), <br />proposed on 7 December 2022. The permit requires that the SWDD prepare and submit to the <br />FDEP and the U.S. Environmental Protection Agency (USEPA), Region 4 the following: <br />• Annual statement of compliance (within 60 days after the end of the calendar year); <br />• Electronic Annual Operating Report (AOR) and Title V Emissions Fee (on or before <br />April 1 of each year, for the previous calendar year); <br />• Semi -Annual Monitoring Report (scheduled for March 1 and August 29); and <br />• Results of an annual landfill gas (LFG) sulfur content test (Annual Emissions Report for <br />Sulfur Dioxide letter report and included in the Electronic Annual Operating Report). <br />The annual emissions fee is automatically calculated based on emissions reported for marked <br />pollutants on the FDEP's electronic Annual Operating Report (EAOR). Upon submission of the <br />EAOR, the Annual Title V Emissions Fee invoice is generated, and this must be paid by April 1, <br />2024 for the 2023 reporting period. <br />Landfill Gas Migration Monitoring <br />The Class I Landfill solid waste permit also requires quarterly monitoring of LFG migration <br />around the perimeter of the site and within enclosed structures. <br />Multi Sector General Permit <br />The SWDD authorization to discharge the overflow of stormwater from the sedimentation pond <br />into the C-6 canal is governed by a five-year Multi Sector General Permit (MSGP) issued by the <br />FDEP on .... The permit requires that the outfall be sampled quarterly during the first and fourth <br />year of the permit for a list of parameters and the results reported to the FDEP by the first quarter <br />of the fifth year of the permit. <br />PROPOSED SCOPE OF SERVICES <br />The proposed scope of services includes activities to be performed on behalf of the SWDD for <br />the compliance monitoring reporting and other technical support services for the Class I landfill <br />and C&D debris disposal facility. For the purpose of budgeting, the scope of work has been <br />divided into the following six (7) main phases: <br />NCP2323548/JL23073 2024 Compliance Monitoring Proposal <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.