Laserfiche WebLink
The following growth expansion schemes may be implemented for future needs: <br />• Design for immediate 10% building and site growth factor.. <br />■ Program for additional vehicle maintenance bays. <br />• Program fiiture building mezzanine store/administration. <br />• Identify possible adjacent site acquisitions. <br />• Identify possible remote site acquisitions. <br />NEEDS ASSESSMENT <br />Project Needs <br />To establish the project needs, the primary existing facility activity areas have been <br />outlined as follows: <br />I. Public Warks vehicle Maintenance <br />2. School District Vehicle Maintenance <br />3. Road & Bridge <br />4• Traffic Engineering <br />S. vehicle Fueling <br />These primary activity areas consist of various secondary activity areas which will be <br />defined in this section of the report. <br />Program Questionnaire/Interviews <br />Each activity area or department "User" response to a Program Questionnaire. This <br />programming tool enables the designer to define the general department data. <br />A. Primary Objectives <br />B. Philosophy <br />C. Function, <br />D. Interior Spatial Requirements <br />E. Interior Spatial Relationships <br />I'- Organization <br />G. <br />Staffing <br />I3. Exterior Spatial Requirements & Relationships <br />I. Growth Potential <br />This department data will he used throughout <br />the final project program, [iiia tnanuai and will become the basis for <br />Each department manager was interviewed and given an opportunity to present their <br />needs. The design professional observed each existing department and became familiar with <br />the daily operations and functions. <br />8111,vrsarellATAVJkOl ei-WWrr€ZDAtILJIM 5 <br />