My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-082
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2024 10:15:54 AM
Creation date
2/27/2024 10:14:40 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />40 <br />40 <br />the first phase of constnaclion will he the pool complex and associated improvements. <br />The primary components or the site will include: <br />A. Tits pool complex wlsupport building for baths, showers, lockers, mechanical, tide[ <br />management,. <br />B. A stonliwater lake (also used to generate fill for the site), lresshox, <br />C. A "four-plex" of multi-purpose hall fields with a two story coatecssion, l <br />and resh•ootns, <br />D. A soccer complex (to be developed separately by a soccer club which will hold a <br />sub -lease agreement will) the County), <br />E. A playground, <br />F. open space (for general multiple uses), <br />G. A inaillicn:ince building of approximately 55() square feet. <br />The intent is to obtain permitting for all site-rclated improvements initially, (i.e. <br />jurisdictional agcncieti, site plan approval) will] subsequent phases of construction to <br />follow as funds become available. <br />2. PR EC PROGRAMMING GOALS, ANI7 f)1311?C'1'IVIi5: Consultant team <br />steC with tllc County.s representatives asci other interested parties in a Pre -Design <br />Workshop to discuss their goals for the project. (This occurred oil 219!00.) Minutes of <br />this meeting are attached. The contents of the minutes Shall be used throughout the <br />planning process to provide a clear undlerstanditig of County expectations, Any <br />significant deviations froin the dirccticxt establisliedl during the pre -design workshop <br />maty result in the need for Additional Services. <br />3. CONSULTANT TEAM- Bradt Smith Associates, [tic. shall lie rhe Prime Consultant, <br />and Shall be responsible for maasicr planning and design of the park. The lir[" will b,-- <br />coordinating <br />ecoordinating the efforts of the loilowing Still -consul lants whicli will he serving, in <br />support roles: <br />A. Carter Associates, ]nc. (surveying, sto"I'Miter, and civil engineering) <br />13. Environmental Consulting Group (environmental consulting,) <br />C. Edlundl and I7ritenbas, Architects (architectural design) <br />I) Garrison & Frohlich,(ntcclianical, electrical, plumbing, lighting design <br />crgincers) <br />2) Jenkins and Charlandl, (structural engincers) <br />U. Weller Pool Constructors (pool consultants) <br />4. PROFFSSIONAI. SERV! H-5: The professional service of the l'911tiultant tenor Shall <br />be as follows: <br />A. Task I — Site ]rive a n surva; in and cnviranrnent of Itisetismen <br />1) Carter Assoc°rate%, Inc. will prcpaare. Ilodinefill'yitf117f1t!l'illllireil! survey of project <br />site to include the following: <br />a) Boundary survey prepared) by a licensees and registered Florida Professional <br />Surveyor and Mapper which ["eels the attilihuusat teclxric.11 stuitolasrdS sol <br />forth by the Florida Board of Profes%ionaat Surveyors aril Mappers in <br />Chapter 61617, Florida. Administrative Code pursuant to Section 472.027, <br />Florida Statutes. <br />b) 'Topographical survey of the site oil a 100' grid. cross-sectiorls and <br />topography of Cit 512, extending MY cast and well of the site. <br />Aunchmcnl - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.