Laserfiche WebLink
40 <br />40 <br />G <br />• <br />c) Location of all existing improvements oil site (itlelutling culverts, ditches, <br />roadways, fences, etc.) and within said right-of-way of C 8512. <br />d) Location of wooded tracts (along the abandoned railway corridor), all([ of <br />specific trees andlor palms within the open pastureland. Note: individual <br />trees within woodland tarts will not be located, due to the fact that arca <br />improvements will be located in these areas. <br />e) Locations of the limits of jurisdictional wetlands (as delineated by Reese <br />Kessler, Environmental COlrillltant). <br />f) Location of other above ground features located adjacent to the site including <br />County lilt station, Sebastian River Middle School entrance roadway and <br />west parking lot, and any other additional data derated necessary by Carter <br />Associates, Inc, for design of iniproverlicnts. <br />2) Environmental Consulting Group will protide the following, based on the <br />assumption tlt.rt the project will be designed to avoid wetland impacts and <br />therefore will not require wetland mitigation <br />a) Conduct in on-site investigation to deteruline the qualitative eilvirun tile nlal <br />conditions of the properly. <br />b) Delineate and llag wetland boundaries as defined by Chapter 62-240, <br />Florida Administaative Code, and tale U.S. Array Corps of Engineers 1987 <br />Wetland Delineation Manual. <br />c) Coordinate and submit correspondence to the St. Johns River Water <br />Management. District and the U.S. Array Corps of Engincet:: requesting a <br />site review to field verify flagged wetland boundaries and to discuss <br />permitting issues. <br />d) Meet onsite with the St. Johns River 'Water Management District and the <br />U.S. Army Corps of Engineers to field verify flagged wetbusd boun(aries. <br />e) Coordinate with Carter Associates, Inc. concerning the wetland boundary <br />flagging, <br />F) Prepare and submit correspondence along will' the land survey identifying <br />the flagged wetland boundaries to Ale St. Johns River Willer Management <br />District and [lie U.S. Army Carps of Fngincers to oblain written verilicattioit <br />of the wetland delinea(ion. <br />g) Prepare all(] submit a report addressing the welland delineation, wetland <br />duality and project design as it affeeis wetlands. <br />B. Task 2 — Prelimin•iry Architectural Design Feature Prograntiatin <br />1) Conduct in Architectural Features Design Prt)gramnrang Workshop with <br />Recreational Operations and l'ragrauii personnel, and other appropriate County <br />stalll' tee discuss specilic space and use requirements. Represciltwives frons <br />Weller Pool Constructors aand Edlund and Dritenbas, Architects will be present. <br />The purpose of the meeting will be to clearly del -me the design parameters for <br />the building with tilt objective to best nice( tine Comity "s iralaiisetracnts. Plans <br />from other :similar prnjecls will be presented lin• review and co"I'lle at. In <br />addition to the building at the Pool complex, the concctitifonlpt°essbuxlecstrcxrnt <br />building at the firer-plcx ball fields and the limilitenailec building will be <br />discussed. <br />2) Edlund and Dritcnlrrs, Arel'ilccts will Prepare a written irchitectur: t design <br />Program for the County's review and approval, based on decisions made during <br />the Architecluraal Features Design Prog,rainmbig Workshop. <br />3) {ail [lie basis of the •appnived tu•clnlecturil design ptogn,"ll. Edlund and <br />Drilenhw, , Aic•hilects will prepare schen clic design drawings consisting of floor <br />111,111sand huildingelmnions forreview by County stall. <br />Arractaatunt - :i <br />