Laserfiche WebLink
do <br />4D <br />• <br />4D <br />c) Pool Design: <br />♦ Weller Pool ConsartICtOrN will prepare final construction drawings For <br />the pools identified in ilia Preliminary Design Submittal, including all <br />related mechanical; and Structural drawings. <br />♦ Weller will furnish all electrical rx quircnneuls to !•dlund and Dr`itenbas, <br />Architects to he incorporated into the electrical drawings for the project. <br />d) Architectural Design: <br />+ Cdlund and Dritenbas, Architects will prepare final construction <br />drawings for till architectural fetltures identified in alae Preliminary <br />Design Submittal. <br />c) Landscape and Irrigation Design: <br />♦ Prepare final construction drawings for all landscape improvements. <br />t Prepare furcal construction drawings for the landscape irrigation System. <br />System shrill USC the lake(s) on site as its source, with wells providing <br />brick -up. <br />t) Site Amenities and Recreational Design: <br />♦ Prepare final construction drawings for playground, project idemificat ion <br />signage, site directional and informational signage, site lighting dour-plex <br />baseball field lighting, poral complex site lighting, and ilia playground <br />lighting. <br />♦ Four-piex ball field shall be a re -use of the design for South County <br />Park. <br />2) Prepare a final Opinion of Probable Construction Costs, along with bid schedule <br />for paving, gualing, drainage, water, sewer, lighting, structures, landscape, <br />irrigation, site furrnisltings, signage, Structures, pool complex, and other <br />miscellaneous improvements. <br />3) Meet with County to review pre -final (90%) drawings, revised opinion of <br />probable construction costs; to receive review comments, and authorization <br />to finalize the construction drawings. <br />4) Meet with County to present final construction drawings and specifications, and <br />to discuss ilia bidding phase of tine project. <br />Task 9: -- Bidding and Construction 1111,1se Services <br />l) Prepare hid an(] construction (IoearnaeniS by providing a laid Harm and <br />specifications ror site improvements. <br />2) Attend pre -hid conference to be coordinated by County staff. <br />3) ,Review bids received by tine County and provide comments and <br />recommendations to the County. <br />4) Attend pre -construction meeting to be coordinated by County saff. <br />5) Observe the work of the contractor on an intcrnnia ma basis not to exceed a total <br />of eight (8) site visits as requested by County to observe work progress and to <br />determine if the construction is Proceeding in general accordance with the <br />contract documents. <br />G) Carter Associates will provide a Construction Review Specialist to observe utility <br />construction activities per IR('DLIS requirements. An allowance of 2t} site visits <br />is included. <br />7) Notify the County of observed deficiencies in the work. <br />8) Review and approve: <br />a) Shop drawings and samples. <br />b) Results of tests and inspections. <br />C) Other data which (lie contractor or subcontractors are required to submit. <br />9) Monitor contractors progress relative to established schedules and report status <br />to Coamy by preparing field repons for each site visit. <br />Aataidiment - 7 <br />