My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-082
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2024 10:15:54 AM
Creation date
2/27/2024 10:14:40 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/21/2000
Control Number
2000-082
Agenda Item Number
11.G5.
Entity Name
Brad Smith Associates, Inc.
Subject
Professional Architectural Services Agreement for North County
Regional Park/Sebastian Buffer Preserve
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of <br />4D <br />C> <br />C' <br />4D <br />10) Project close-out drill begin upon notice from the Contractor that Ilis work, <br />which is believe([ to lie acceptable to tile. County, is substantially complete and in <br />general accordance with (tie contract documents. At this point in little, the <br />Landscape Architect and tile Consultant Team shall conduct a walk-through with <br />the County's representative to verify that alae work conforms to the contract <br />docurnents, and to establish a "punch fist" of items to he completed or corrected. <br />1 l) Upon notice by the contractor that tile"pulich list" has hccal completed, and that <br />the work is ready for final inspection and aeceptaucc, the Landscape; Architect <br />and the Consultant Team Shall conduct a walk-through to verify "punch list" <br />completion for final acceptance of the work by the County. <br />12)If deficiencies are found, these will be itcnlired .old it follow-up walk-through <br />wil l lie made to verify final completion of the work. <br />13) Visits for to purposeof projccl-close Oil( as described above, are included in the <br />eight (fl) site visits indicated above. <br />14) Prepare final ccrtificatiom sof site work upon completion of site work in <br />accordance with the approved plans. <br />I5)'I'he Consultant upon the consensus of his sub -consultants will review and <br />approve forpaynunt the Contractor's pay requests. The Consultant will review <br />and m=ake recommendations on the Contractor's progress schedule and work <br />plan. Six (G) pity requests (one per month) and a final payment request are <br />expected. It is anticipated that [lie project will he built on (lie basis of a 180 dray <br />contract for constiitction. <br />Ib) Carter Associates will prepare a linin "US-htliIt" survey. <br />17)'I'he County recognizes that construction ivview is it vital clement of a Design <br />Professional's complete service, provided to minimize problems during <br />construction. Should the County for any reason not retain the COlist, lta'it Team <br />to review construction, file County waives any claim against tilt Consultant. aunt[ <br />agrees to indemnify, defend and hold the Consultant Team harrnlexs front any <br />claire or liability for ilAlury or loss iarising I'rom problems (luring construction <br />thal allegedly result from findings. conclusions, recommendation.,;, plans (it- <br />specifications <br />rspecifcaltio ns developed by [lie Constiltant I'ealll. <br />5. SPECIFIC ASSUMPTI()"iS Consultant represents to [he County than in developing <br />this Scopc ofWork. assumpt.,nas have been made, and that deviation from aassunlpuons <br />identified within this proposal may require additional expenditures on behalf sof the <br />County to tine Consullant. Asstanlpla(ilIS atilt ilh-CAly mentioned herein are as follows: <br />A. County staff will prepare it Traffic Study to meet lndi. River County (l.R.C.) <br />concurrency requirements, if required. Additional traffic Sutdies, it required are to <br />he provided by the County. Thcsc call also be provided its Additional Services to Ix <br />authorized wpiar-ately. <br />B. The existing waterline ill [lie C.R. 512 right-of-way has adequate capacity to serve <br />this project and thal off -Site utility extensions will not be needed. <br />C. Sign permitting is included. <br />D. All permitting, a1lilicaticin, impact and testing, fees will be paid for by tau County. <br />E. 'peclinicai slleciiiciations will be provided to the County by tile. Consultant. County <br />will he responsible for nor[ -technical specifications and contract documents, as well <br />as [lidding phase duties. Preparation Of!L Bid Schedule is include([. <br />F. Indian River County Land Development permit waivrrs will lie obtained. <br />G. Infrastructure ilnprovcnlcnts Shall[ he it single design tier one phase inclusive. <br />H. Weller Pool Constructors will be cl niracted directly by [he Comity [hider separate <br />Agreement to construct the pool. This will be accomplished by using the "PiggY- <br />hacking method of contracting. If the County elects to oblain it pmol Contractor by <br />other means such its competitive bidding, Additional Services would be required to <br />Attachment - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.