My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/09/2024
CBCC
>
Meetings
>
2020's
>
2024
>
01/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2024 11:17:49 AM
Creation date
2/29/2024 9:58:46 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/09/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
597
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Reconnoiter and locate subdivision PRM's, PCP's, block corners and lot corners, <br />as necessary. <br />• Perform site specific topography as required by the project engineer to include <br />visually obstructed areas from LiDAR, as built of all drainage str ebbs, <br />IRFWCD and subdivision culverts, driveway culverts. <br />• Locate all trees and vegetation within the Oslo Park Subdivision road right of ways <br />only and rear lot line easement plus 5 feet outside of the easement. <br />• Perform cross sections of IRFWCD drainage canals. <br />• Coordinate with and observe underground utility locations by others. <br />Office Tasks: <br />• Calculations, boundary determination, differential level adjustments, coordination <br />with field and office staff <br />• Prepare survey base map of Oslo Park Subdivision geometry based on platted and <br />observed information. <br />• Prepare topographic survey of project site utilizing 3D LiDar surface prepared by <br />LJA as base map and field observed topography to create 'overall model and <br />contour map. Topographic survey to also include locations all improvements, <br />above ground (visible) utilities, vegetation, driveways (to garage apron), culverts, <br />mailboxes, etc. in the right of way. <br />• Prepare control sheets with 100 feet stationing for engineering design plans. <br />• Prepare sheets, title blocks and drawing sets for engineering design (approx. 85 <br />sheets at 40 scale —11 "x17"). <br />• Prepare cover sheet, plan and profile sheets of right of ways and plea view rear lot <br />swale/easement. <br />• Input owner provided utility locations into survey base map. <br />• Quality Assurance and Quality Control <br />LiDAR <br />• LJA Surveying will perform UDAR topographic survey with the required check <br />shots as specified by state regulations. LJA will produce a topographic survey with <br />1 foot contours and mapping of all planimetric's within the project limits. <br />• CAI will coordinate and assist LJA Surveying with placement of Ground Control <br />Points/Aerial Targets for performance of LDar of project site. <br />• Establish horizontal and vertical control of Ground Control Points/Aerial Targets. <br />• Perform ground truthing shots for verification of LiDAR created 3D surface. <br />B. Geotechnical Investigation: CAI will coordinate sub -soil testing of the existing roadways <br />through our sub -consultant RSM. Paving section recommendations will be provided by <br />KSM. (Reference attached KSM Engineering and Testing scope of work and fee proposal <br />dated 10/20/2023). <br />C. Investigate Permitting Requirements: CAI will conduct formal pre -application meetings <br />with St. Johns River Water Management Distrix (SJRWMD) and Indian River Farms <br />ftV iAQf'4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.