My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/09/2024
CBCC
>
Meetings
>
2020's
>
2024
>
01/09/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2024 11:17:49 AM
Creation date
2/29/2024 9:58:46 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/09/2024
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
597
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Also, the COUNTY desires to pave 12th Street SW and 131` Street SW between 9th Court SW <br />and 17" Avenue SW. <br />The total length of unpaved roadways to be paved is approximately 4.5 miles. <br />The Oslo Park drainage area to be analyzed consists of approximately 0.1 6 square miles confined <br />between 9h Court SW to the east and 17th Avenue SW to the west, and between 111h Street SW <br />to the north and IRFWCD Sub -Lateral Canal B-8 to the south. The existing Oslo Park drainage <br />system utilizes approximately 4.5 miles of roadside swales and approximately 3 miles of rear lot <br />swales to drain the subdivision from north to south and thence discharge via culverts under 13th <br />Street SW to IRFWCD Sub -Lateral Canal B-8. CAI will require access to all areas within Oslo <br />Park to conduct our investigation. <br />We anticipate additional drainage connections to IRFWCD Sub -Lateral Canal B-8 will be <br />necessary to accommodate the increase in stormwater runoff resulting from an increase in <br />impervious area due to the proposed paving. <br />SECTION II — SCOPE OF SERVICES <br />CAI agrees to perform professional engineering and related services in connection with the <br />project as required and as set forth in the following: <br />Phase One: <br />Fallowing issuance of a Notice to Proceed (NTP), CAI will coordinate a kick-off meeting with <br />COUNTY staff to discuss specific issues relative to the project and to verify scope and design <br />parameters. <br />A. Survey: CAI will provide a full topographic and boundary survey of the existing right- <br />of-way, including roadways, driveways, mailboxes, trees, vegetation, drainage system <br />and all above ground obstacles. The survey will also include the rear lot swale system, <br />IRFWCD Sub -Lateral B-8 Canal, and aboveground/underground utility locations. CAI <br />will coordinate directly with utility providers to obtain information relative to the location <br />of underground utilities. The survey drawings will be utilized as base drawings for <br />engineering design. <br />Field Survey Crew Tasks <br />• Review survey objective and scope of project with field crew. <br />• Research subdivision control, plats, surveys, county provided survey information, <br />benchmarks, etc. Prepare field crew field file, work sheets and maps for survey <br />observations, <br />• Establish horizontal site control for project control and boundary reconnaissance. <br />• Establish vertical control for ground control points/aerial targets and site-specific <br />topographic survey. <br />
The URL can be used to link to this page
Your browser does not support the video tag.