My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-044
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2024 12:41:32 PM
Creation date
3/7/2024 12:39:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/20/2024
Control Number
2024-044
Agenda Item Number
8.L.
Entity Name
Masteller & Moler, Inc.
Subject
Amendment No. 2 to Work Order No. 14 for North County Spoonbill Marsh River Intake Station
Access WWTF 24” Force Main Replacement IRCDUS Proj. ID 21.23.503
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M J MASTELLER & MOLER, INC. 165527 1h Street, Ste. 2, Vero Beach, FL 32960 <br />CIVIL ENGINEERS <br />(772) 567-5300 <br />The intent of the FDEP /ACOE certifications will be to confirm the proiect has been constructed <br />with no more wetland impacts than was permitted. <br />We shall prepare One (1) Engineering Certification for each of the above -listed permits. Our <br />submittal of certifications assumes that all maintenance roadway upgrade work will be properly <br />constructed and tested prior to submittal of the Engineering Certifi cations <br />Fee Schedule: <br />Phase 1— New Electric Power System <br />Task 1A —Civil Engineering Design & Preparation of Construction Plans $ 8,000.00 <br />Task 1B — Electrical Engineering Design & Preparation of Construction Plans $ 4,600.00 <br />Task 1C — Environmental Services $ 10,350.00 <br />Task 1D — Soils Investigation $ 4,025.00 <br />Task 1E(1) — Construction Procurement Services (Civil) $ 3,000.00 <br />Task 1E(2) — Construction Procurement Services (Electric) $ 1,150.00 <br />Task 1F — Construction Services (Electrical) $ 6,325.00 <br />Task 1G — Construction Services (Civil) $ 5,000.00 <br />Sub -Total $ 42,450.00 <br />Phase 2 — Unpaved Maintenance Roadway Upgrade <br />Task 2A — Civil Engineering Design & Preparation of Construction Plans $ 16,000.00 <br />Task 2B — Environmental Services $ 14,260.00 <br />Task 2C — Construction Procurement Services $ 3,000.00 <br />Task 2D — Construction Services (Civil) $ 8,000.00 <br />Sub -Total $ 41,260.00 <br />Reimbursable Expenses Phases 1 & 2 (Not To Exceed) <br />Total Fees <br />$ 4,000.00 <br />$ 87,710.00 <br />Permit review fees are not included in the fees above. As the permit review fees are unknown <br />at this time, Consultant shall provide the fees and will invoice for them separately to be <br />reimbursed by the County. <br />Mitigation fees are excluded from this Work Order. <br />[Remainder of this page is intentionally left blank.] <br />Page 10 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.