Laserfiche WebLink
M J MASTELLER & MOLER, INC. 165527 1h Street, Ste. 2, Vero Beach, FL 32960 <br />CIVIL ENGINEERS <br />(772) 567-5300 <br />The intent of the FDEP /ACOE certifications will be to confirm the proiect has been constructed <br />with no more wetland impacts than was permitted. <br />We shall prepare One (1) Engineering Certification for each of the above -listed permits. Our <br />submittal of certifications assumes that all maintenance roadway upgrade work will be properly <br />constructed and tested prior to submittal of the Engineering Certifi cations <br />Fee Schedule: <br />Phase 1— New Electric Power System <br />Task 1A —Civil Engineering Design & Preparation of Construction Plans $ 8,000.00 <br />Task 1B — Electrical Engineering Design & Preparation of Construction Plans $ 4,600.00 <br />Task 1C — Environmental Services $ 10,350.00 <br />Task 1D — Soils Investigation $ 4,025.00 <br />Task 1E(1) — Construction Procurement Services (Civil) $ 3,000.00 <br />Task 1E(2) — Construction Procurement Services (Electric) $ 1,150.00 <br />Task 1F — Construction Services (Electrical) $ 6,325.00 <br />Task 1G — Construction Services (Civil) $ 5,000.00 <br />Sub -Total $ 42,450.00 <br />Phase 2 — Unpaved Maintenance Roadway Upgrade <br />Task 2A — Civil Engineering Design & Preparation of Construction Plans $ 16,000.00 <br />Task 2B — Environmental Services $ 14,260.00 <br />Task 2C — Construction Procurement Services $ 3,000.00 <br />Task 2D — Construction Services (Civil) $ 8,000.00 <br />Sub -Total $ 41,260.00 <br />Reimbursable Expenses Phases 1 & 2 (Not To Exceed) <br />Total Fees <br />$ 4,000.00 <br />$ 87,710.00 <br />Permit review fees are not included in the fees above. As the permit review fees are unknown <br />at this time, Consultant shall provide the fees and will invoice for them separately to be <br />reimbursed by the County. <br />Mitigation fees are excluded from this Work Order. <br />[Remainder of this page is intentionally left blank.] <br />Page 10 of 11 <br />