Laserfiche WebLink
Geosyntecl�' <br />consultants <br />Mr. Himanshu Mehta, P.E. <br />Managing Director <br />Solid Waste Disposal District <br />Indian River County <br />1325 74th Avenue SW <br />Vero Beach, Florida 32968 <br />1507 20th Street, Suite 201 <br />Vero Beach, Florida 32960 <br />PH 772.564.8717 <br />Fax 772.564.8719 <br />www.geosyntec.com <br />2 February 2024 <br />Subject: Proposal to Provide Engineering and Construction Support Services <br />Phase 2 Construction of Cell 3 of Segment 3 Expansion <br />Indian River County Class I Landfill <br />Vero Beach, Indian River County, Florida <br />Dear Mr. Mehta: <br />Geosyntec Consultants (Geosyntec) is pleased to submit this proposal to the Indian River County <br />(IRC) Solid Waste Disposal District (SWDD) to provide engineering and construction support <br />services related to Phase 2 construction of Cell 3 of Segment 3 Expansion (hereafter referred to <br />as the Project) of the Class I Landfill at the IRC Landfill (IRCL) facility located in Vero Beach, <br />Indian River County, Florida. The proposal presents the scope of work, schedule, and budget <br />estimate to provide construction -phase services for the Project. The proposal was prepared in <br />response to a request from Mr. Himanshu Mehta P.E., Managing Director of SWDD, to Dr. <br />Kwasi Badu-Tweneboah, P.E. of Geosyntec. Geosyntec has prepared this proposal as Exhibit 1 <br />of Work Order No. 1 for the Agreement for Engineering Consulting Services for Landfill <br />Closure, Landfill Gas System Expansion, and Cell Construction dated 4 April 2023 (collectively <br />referred to as the "Agreement"), by and between INDIAN RIVER COUNTY, a political <br />subdivision of the State of Florida ("COUNTY") and Geosyntec ("CONSULTANT"). <br />The remainder of this proposal presents: (i) project background; (ii) proposed scope of work; (iii) <br />schedule; and (iv) budget estimate. <br />PROJECT BACKGROUND <br />The IRCL facility is located in southern Indian River County, east of Interstate 95, south of Oslo <br />Road, and west of Rangeline Road in Vero Beach, Florida. The SWDD administers the <br />management and operation of the Class I landfill at the IRCL facility. The Class I Landfill <br />includes the closed Segment 1/Infill/Segment 2 vertical expansion, and active Segment 3 lateral <br />expansion (Segment 3). The total footprint area of Segment 3 is 76 acres and consists of eight <br />cells that are being constructed in phases as needed. Segment 3, C ell 1, directly east of and on <br />top of the east slope of Segment 2, was constructed in 2013. Segment 3, Cell 2 was constructed <br />NCP2323534UL23075 Proposal for Engineering and Construction Services kbtreview.doc <br />engineers I scientists I innovators <br />