My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-046
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2024 10:28:22 AM
Creation date
3/8/2024 10:26:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/20/2024
Control Number
2024-046
Agenda Item Number
15.B.2.
Entity Name
Geosyntec Consultants, Inc.
Subject
Amendment 2 to Work Order 1 for Phase 2 Segment 3 Expression, Cell 3 Engineering Services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr..Himanshu Mehta, P. E. <br />2 February 2024 <br />Page 5 <br />Excel's fee schedule is included in Attachment A. The test results will be reviewed by the CQA <br />Site Manager. SWDD will be provided with regular updates of the conformance and <br />performance testing activities and results. Summary reports of the test results will be presented <br />in the certification report. <br />Geosynthetic CQA Laboratory Services <br />Geosyntec will perform: (i) conformance testing of the geosynthetic materials; and (ii) <br />destructive testing of the geomembrane seams at an off-site geosynthetic CQA testing laboratory. <br />Conformance sampling of the geosynthetics will be undertaken at the manufacturing plant prior <br />to shipment of the geosynthetics to the site. This will expedite the conformance testing and <br />eliminate delays in the field waiting for test results. Geosyntec proposes to use TRI <br />Environmental (TRI) of Austin, Texas to perform the required geosynthetics testing. Geosyntec <br />will be responsible for coordinating collection of conformance test samples with the TRI and the <br />geosynthetic manufacturers. TRI will be responsible for all conformance testing. The CQA Site <br />Manager will also coordinate collection and shipping of geomembrane destructive seam samples <br />at the frequencies specified in the CQA Plan to TRI. The laboratory will perform geomembrane <br />seam strength tests for compliance with the Technical Specifications and CQA Plan. A copy of <br />TRI's fee schedule is included in Attachment B. Test results will be e-mailed to the site in order <br />to avoid delays with the construction schedule. <br />Surveying CQA Services <br />Geosyntec will subcontract the services of a Registered Land Surveyor to provide the surveying <br />required and prepare the as -built record drawings of the Cell 3 liner and leachate control systems <br />construction. Geosyntec has selected Peavey & Associates (Peavey) of Fort Meade, Florida to <br />provide surveying services. Peavey will assist with surveying the critical layers of the liner <br />system construction and provide data to check material quantities for measurement and payment <br />purposes. A copy of Peavey's proposal is enclosed as Attachment A. <br />Phase 4: Construction Management <br />Geosyntec will provide construction management (CM) services throughout the duration of <br />construction. CM activities will include conducting pre -construction and weekly construction <br />progress meetings with the Contractor and its subcontractor(s), preparing and distributing <br />meeting minutes, reviewing the Contractor's construction schedule for evaluating construction <br />progress, assisting the Contractor and SWDD in identifying critical construction phases and <br />material procurement activities, providing assistance to the Contractor in formulating plans to <br />regain the project schedule in case of unforeseen delays, reviewing Contractor payment requests <br />and verifying quantities and conformance with the plans and specifications, and providing <br />NCP2323543UL23075 Proposal for Lngineering and Construction Services kbtreview.doc <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.