Laserfiche WebLink
Mr. Himanshu Mehta, P. E. <br />2 February 2024 <br />Page 6 <br />contract administration to include construction -related correspondence with the Contractor and <br />SWDD. <br />Phase 5: Resident Engineering and Certification Services <br />Geosyntec will provide resident engineering services throughout the duration of construction. <br />Resident engineering services will include Construction Drawings and Technical Specifications <br />interpretation or clarification, an evaluation of any changed conditions, and engineering analyses <br />for any design changes or improvisations. Geosyntec will also provide support to SWDD in the <br />preparation of modifications, deletions, or additions to the contract documents. Contractor's <br />change proposals will be evaluated for technical merit, conformance with design intent, and <br />reasonableness with respect to pricing. Geosyntec will also assist SWDD in the review and <br />approval process for submittals required by the contract documents. Resident engineering <br />services are expected to include engineers, administrative assistants, CADD designers, and <br />technical word processors, as needed. <br />As part of the Resident Engineering phase, Geosyntec will prepare a final QA/QC certification <br />report, which will include as -built record drawings for the Project. The report will contain a <br />narrative describing, in detail, the aspects of field activities associated with the Phase 2 <br />construction, specifically with reference to the activities identified in this proposal. The report <br />will also include a summary of all conformance and performance tests conducted, testing <br />frequencies, and test results showing compliance with the Technical Specifications and the CQA <br />Plan. The documentation of construction activities (presented on daily summary reports, <br />monitoring logs, test data sheets, nonconformance identification and corrective measures reports, <br />and design change records) will be included as appendices to the final report. The as -built record <br />drawings will be prepared for the Project, in AutoCAD format, in order to illustrate the details of <br />construction, any approved design changes or deviations. Peavey will be responsible for <br />preparing the as -built drawings signed and sealed by a registered land surveyor in the State of <br />Florida. Geosyntec will coordinate and review drafts of the as -built drawings to ensure <br />compliance with the Project and permit requirements. <br />The final QA/QC certification report will be signed and sealed by a registered professional <br />engineer in the State of Florida. Geosyntec will prepare the report within 30 days of completing <br />the construction activities. Electronic copies of the final QA/QC certification report will be <br />submitted to FDEP for approval with copies provided to SWDD. <br />NCP2323543UL23075 Proposal for Engineering and Constniction Services kbtreview doc <br />engineers I scientists I innovators <br />