My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-090
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 10:34:43 AM
Creation date
3/12/2024 10:17:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/21/2000
Control Number
2000-090
Agenda Item Number
11.H.2.
Entity Name
Tri-Sure Corp.
Subject
Rockridge Sewer Project
Bid Number
2028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />40 <br />M <br />6706-050 <br />4.2.1.1.1 ENGIEER has relied upon the data obtained from <br />subsurface satasismade <br />in thethe <br />formiof boring loge is <br />te in the form 'Of <br />test boring. Such <br />available, refer to Section 00200, Information to Bidders, <br />for instructionp� an how to obtain. -this data. The locations <br />of the test borings are ipartaofdDrawings. <br />the ContractDocuments. <br />logs and samples are not p <br />and <br />recording <br />Contractor is existing swaleselevationsonsible oatm100' intervals prior <br />recording Swale elevations shall be <br />to construction. Existing <br />maintained throughout construction. Contractor is also <br />eation allponsibingfor perpresmaneat survey amo�umentationor maffectedof nbyand <br />construction. <br />Add a new paragraph immediately after 4.4 of the General <br />Conditions which is to read as follows: <br />4.4.1 ENGINEER may check the lines, elevations, reference <br />marks, batter hoards, etc., set by CONTRACTORS, and <br />CONTRACTOR shall correct any errors disclosed by such a <br />check. Such a check shall not be considered as approval of <br />CONTRACTOR'S work and shall not relieve CONTRACTOR of the <br />responsibility accurate <br />he <br />CONTRACTORshall furnishpersonnelutolon Of t <br />assistENGINEEReinork. <br />checking lines and grades. <br />ARTICLE 5. BONDS AND INSURANCE <br />SC -5.1 Delete the sentence of paragraph 5.1 of the General <br />Conditions in its entirety and insert in its place: "The <br />of <br />CONTRACTOR shall furnish a payment 'bond for l00 percent <br />the total amount of the Bid and a performance bond for 125 <br />pecentity for the underful thepcontrce <br />Bid as act <br />documents." <br />SC --5.4 The limits of liability for the insurance required <br />by paragraph 5.4 of the General Conditions shall provide <br />coverage for not less than the following amounts of greater <br />where require by law: <br />5.4.1 and 5.4.2 Workers' Compensation <br />(1) Workers' Compensation Statutory <br />s <br />(2) Employer's Liability $1,000,000 <br />1 00800-5 <br />F <br />
The URL can be used to link to this page
Your browser does not support the video tag.