Laserfiche WebLink
1.04 PRODUCT DATA <br />A. Preparation! <br />I. clearly mark each copy to identify applicable <br />products, models, options, and other data. <br />characteristics and <br />2. Show performance <br />capacities. <br />3. Show dimensions and clearances required. <br />4. Show wiring or piping diagrams and controls. <br />B. Manufacturer's standard schematic drawings and <br />diagrams: <br />1. Modify drawings and diagrams to delete <br />information which is not applicable to the <br />work. <br />2. supplement standard information to provide <br />information specifically applicable to the <br />work. <br />3. include manufacturer's installation <br />instructions when required by the <br />Specifications Section. <br />1.05 SAMPLES <br />requiring colr- <br />A. office samples: Limit to items requd shall be <br />pattern and similar selections an <br />sufficient size and quantity to clearly illustrate: <br />1. Full range of color, texture and pattern <br />2. Submit samples for selection of finishes <br />within sixty (60) days after date of <br />Agreement, or when directed by Engineer <br />B. Field Samples and Mock-UPs: <br />1. Functional characteristics Of the product, <br />with integrally -related parts and attachment <br />devices <br />2. contractor shall erect, at the project Site, <br />at a locati-on acceptable to the Engineer <br />3. Size of Area: that specified iii the <br />respective specification section complete and <br />4. Fabricate each sample and mockup co <br />f inished <br />5. Include identification on each sample, 9�iv'nO <br />full information <br />6. Remove samples at conclusion Of work, or when <br />acceptable to the Engineer <br />01340-2 <br />