Laserfiche WebLink
r <br />1.06 MANUFACTURER'S CERTIFICATES <br />?` A. Submit Certificates, in duplicate, in accordance <br />with requirements of each specification section <br />1.07 CONTRACTOR RESPONSIBILITIES <br />A. Review Shop Drawings, Product Data and Samples <br />prior to submission <br />B. Determine and verify: <br />i.F'ield measurements <br />2.Field construction criteria <br />3,Catalog numbers and similar data <br />4.Confo7rmance with specifications <br />C. Coordinate each submittal with requirements of <br />the work and of the Contract Documents. <br />D. Notify the Engineer in writing at the time of <br />submission of ANY AND ALL DEVIATIONS in the <br />submittals from requirements of the Contract <br />Documents. All of the Contractor's comments <br />and notations shall be in red ink. <br />E. Begin no fabrication of work which requires <br />submittals until return of submittals with <br />Engineer's approval. <br />1.08 SUBMISSION REQUIREMENTS <br />A. Make submittals promptly in accordance with <br />approved schedule, and in such sequence as to cause <br />no delay in the work of any other Contractor.. <br />B. Number of submittals required: <br />1. Shop Drawings: Summit the number of opaque <br />reproductions which the Contractor require:, <br />plus four (4) copies which will be retained by <br />the Engineer <br />e <br />2. Product Data: Submit the number of copies <br />which the Contractor requires, plus four (4) <br />which will be retained by the Engineer <br />3. Samples: Submit the number stated in each <br />specification section <br />J <br />�. 01340-•:3 <br />