My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-090
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 10:34:43 AM
Creation date
3/12/2024 10:17:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/21/2000
Control Number
2000-090
Agenda Item Number
11.H.2.
Entity Name
Tri-Sure Corp.
Subject
Rockridge Sewer Project
Bid Number
2028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />40 <br />4W <br />' D. Submit copy of report of inspection of facilities_ <br />made by Materials 'Reference Laboratory o£ National. <br />Bureau of Standards during the most recent tour of <br />inspection, with memorandum of remedies of any <br />deficiencies reported by the inspection. <br />E. Testing Equipment: <br />1. Calibrated at reasonable intervals by devices <br />of accuracy traceable to either: <br />a. National Bureau of Standards <br />b. Accepted values of national physical <br />constants <br />1.04 LABORATORY DUTIES <br />A. Cooperate with Engineer and Contractor; provide <br />qualified personnel after due notice. <br />B. Perform specified inspections, sampling, and <br />testing of materials and methods of construction: <br />1. Comply with specified standards <br />2. Ascertain compliance of materials with <br />requirements of Contract Documents <br />C. Promptly notify Engineer and Contractor of observed <br />irregularities or deficiencies of work or products. <br />D. Promptly submit written report of each test and <br />inspection; one copy each to Engineer, owner, and <br />Contractor, and one copy to Record Documents File. <br />Each report shall include: <br />1. Date issued <br />2. Project title and number <br />3. Testing laboratory name, address, and <br />telephone number <br />4. Name and signature of laboratory inspector <br />S. Date and time of sampling or inspection <br />6. Record of temperature and weather conditions <br />1. Date of test <br />8. Identification of product and specification <br />section <br />l 9. Location of sample or test in the Project <br />10. Type of inspection or test <br />11. Results of tests and compliance with contract <br />Documents <br />12. Interpretation of test results, when reclueste?i <br />by Engineer <br />01410-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.