My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-090
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 10:34:43 AM
Creation date
3/12/2024 10:17:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/21/2000
Control Number
2000-090
Agenda Item Number
11.H.2.
Entity Name
Tri-Sure Corp.
Subject
Rockridge Sewer Project
Bid Number
2028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />40 <br />40 <br />t <br />2.1.7 After an initial bore has been completed, a reamer will be installed at the termination pit <br />and the pipe shall be pulled back to the starting pit. The reamer shall be capable of <br />discharging liquid clay to facilitate the installation of the pipe into a stabilized and <br />lubricated tunnel. <br />2.1.$ A minimum of two 0 insulated #14 trace wires shall be installed along with the HDPE. <br />The trace wire shall be tested for continuity upon completed installation. Should both <br />trace wires fail to pass a continuity test then the test will be considered a failure and the <br />wires shall be replaced. Tracing Wires: # 14 Single Conductor Copper Trace Wire shall <br />be wrapped or affixed to pipe and fittings <br />2.1.$ Upon completion of boring and pipe installation, the Contractor shall remove all spoils <br />from the starting and termination pits. All pits shall be restored to their original <br />condition. <br />2.2 RESTORATION OF PAVED, IMPROVED AND UNIMPROVED AREAS <br />2.2.1 The shoulders, ditches, banks and slopes of roads and railroads crossed and paralleled <br />shall be restored to their former condition and properly sodded so that they shall not <br />wash out before becoming consolidated. Restoration shall be as required by the <br />jurisdictional authority and as specified within the Contract Document. Road and <br />railroad crossings and parallel installations are to be continuously maintained until the <br />completion of the work. No direct compensation shall be paid for Contractor's repair or <br />maintenance of crossings and parallel installations. <br />* * END OF SECTION * * <br />02320-3 <br />( Pn. '.4. P". I.Ria'4n:+e itwrr 0:1 Y1 1,—, lt>rmr:+il 4 <br />tlnntanul <br />tarc:iwnalLWAImg <br />
The URL can be used to link to this page
Your browser does not support the video tag.