My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-090
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 10:34:43 AM
Creation date
3/12/2024 10:17:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/21/2000
Control Number
2000-090
Agenda Item Number
11.H.2.
Entity Name
Tri-Sure Corp.
Subject
Rockridge Sewer Project
Bid Number
2028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4D <br />40 <br />D N <br />13id Item N% 01 - Evia ' `zation <br />1.1 'Scope of Work <br />Under this item, the Contractor shall provide all labor, materials, equipment and <br />incidentals necessary to furnish and install bonds and insurance, site security, staging, <br />temporary field officeltrailer, if required, personnel safety equipment, field surveying for <br />base line, construction and maintenance of temporary facilities, arrangement for <br />temporary utilities, shop drawing submittals, submittal of schedules, breakdown, <br />preconstruction documents, erosion, sediment, and dust control, and all other work <br />required for the initial start of construction. <br />1.2 Materials and Method <br />General Equipment <br />All preconstruction documents, submittals and preliminary work as described above <br />shall be provided as defined in the Contract Documents. <br />1.2.1 Mobilization includes the mobilization of all construction equipment, tools, and <br />appurtenances staffed and ready for performing the work. Mobilization also <br />includes delivery of materials and supplies needed for initiation of the work but <br />not included and paid elsewhere in the Contract documents. The provision and <br />installation of Contractor required facilities, including enclosures, trailers for <br />various activities, personnel storage sheds, as needed; and Contractor required <br />services including telephones, electricity, water and sanitary facilities, etc., are <br />also included under Bid Item NMobil izatiol . <br />1.2.2 The provision of safety equipment 1.nd protective clothing for persons on-site, <br />including maintenance of equipment on a daily basis; and replacement of <br />disposable equipment, as required. <br />1.2.3 Construction of Equipment and Staging Supply Area. <br />1.2.4 Provisions for an office trailer (if required), utilities and equipment for <br />t- Contractor personnel activities.. <br />1.2.5 Arrangements for the temporary construction of any roads, embankments, fence <br />gates or excavations, if needed. Such roads and access facilities shall be <br />sufficient for passage of loaded disposal vehicles and construction equipment. <br />a) Layout of all temporary roads, gates, excavations and embankments to be <br />constructed within the project area <br />00310-7 <br />111 ITEM UI - NI001LIZAitoN <br />y.AL "'ishl®hMA PmlttinProlecA-RocknSYe Ssw.Sr Invpla�rmtnli'i0031O�IIYC <br />
The URL can be used to link to this page
Your browser does not support the video tag.