My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-090
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 10:34:43 AM
Creation date
3/12/2024 10:17:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/21/2000
Control Number
2000-090
Agenda Item Number
11.H.2.
Entity Name
Tri-Sure Corp.
Subject
Rockridge Sewer Project
Bid Number
2028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />i <br />O <br />compaction equipment will not have a damaging effect on the pipe. Equipment used in <br />cornpacting the initial 3 -ft backfill shall be approved by the pipe manufacturer's <br />representative prior to use. <br />s, Good alignment shall be preserved during installation. The deflection at joints shall not <br />exceed that recommended by manufacturer. Fittings, in addition to those shown on the <br />Drawings, shall be provided, if required, in craising utilities, which may be encountered upon <br />opening the trench. <br />T. Each length of the pipe shall have the assembly mark aligned with the pipe previously laid <br />and held securely until enough backfill has been placed to hold the pipe in place. Joints shall <br />not be,, pulled" or "crampcd". <br />U Before any joint is made, the pipe shall be checked to assure that a close joint with the next <br />adjoining pipe has been maintained and that the inverts are matched and confonn to the <br />required grade. The pipe shall not be driven down to grade by striking it. <br />V. Precautions shall be taken to prevent flotation of the pipe in the trench. <br />W. When moveable trench bracing such as trench boxes, moveable sheeting, shoring or plates are <br />used to support the sides of the trench, care shall be taken in placing and moving the boxes or <br />supporting bracing to prevent movement of the pipe, or disturbance of the pipe bedding and <br />the backfill. Trench boxes, moveable sheeting, shoring or plates shall not be allowed to <br />extend below top of the pipe. As trench boxes, moveable sheeting, shoring or plates are <br />moved, pipe bedding shall be placed to fill any voids created and the backfill shall be <br />recompacted to provide uniform side support for the pipe. <br />X. Concrete thrust blocks shall be installed at all fittings and other locations as directed by the <br />Engineer. minimum bearing area shall be as shown on the Drawings. Concrete shall be <br />" placed against undisturbed material and shall not cover joints, bolts or nuts, or interfere with <br />the removal of any joint. Wooden side forms shall be provided for thrust blocks. <br />Y. Restrained joints shall be installed where shown on the Drawings or as directed by the <br />Engineer. <br />I _ <br />0 2.7 'TESTING <br />A. All YIDPE force mains shall be field-tested. supply all labor, equipment, material, gages, <br />t pumps, meters and incidentals required for testing. Pressure test each force roam upon <br />completion of the pipe laying and backfilling operations, including placement of any required <br />p temporary roadway surfacing. <br />All force mains shall be tested at l5o percent of the operating design pressure of the pipe <br />unless otherwise approved by the Engineer. The operating design pressure of the pipe is 100 <br />psi. The test pressure shall be measured at the highest point along the test section by a <br />recording type pressure gage and a copy of the readout shall he submitted to the Engineer <br />upon completion of the test. All testing shall be conducted in the presence of the Engineer or <br />his/her designated representative. <br />'resting shall be conducted after hackfilling has been completed and before placement of <br />permanent surface. <br />15080A • b <br />I . :on—AUA—. P.,Omr M - Rada*9low" bMVW4M rmIV0AA • MO tom` h,ho.kw Pot M*t ion <br />kl"ah nmt�sy V��lycthvtrne <br />P"pc I MW E) <br />
The URL can be used to link to this page
Your browser does not support the video tag.