My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-090
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 10:34:43 AM
Creation date
3/12/2024 10:17:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/21/2000
Control Number
2000-090
Agenda Item Number
11.H.2.
Entity Name
Tri-Sure Corp.
Subject
Rockridge Sewer Project
Bid Number
2028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tf <br />cil <br />+! <br />n -N <br />+ D. Testing procedure shall be as follows: <br />f 1. Fill line slowly with water. Maintain flow velocity less than two feet per second. <br />2. Expel air completely from the line during filling and again before applying test pressure. <br />Air shall be expelled by means of taps at ,points of highest elevation. <br />3. Apply initial test pressure and allow to stand without makeup pressure for two to three <br />hours, to allow for diametric expansion or pipe stretching to stabilize. <br />4. After this equilibrium period, apply the specified test pressure and turn the pump off. <br />'!i be final test pressure shall be held for one to three hours. <br />` 5. Upon completion of the test, the pressure shall be bled off from a location other than the <br />point where the pressure is monitored. The pressure drop shall be witnessed by the <br />resident project representative at the point where the pressure is being monitored and <br />shall show on the recorded pressure read-out submitted to the Engineer. <br />E. Allowable amount of makeup water for expansion during the pressure test shall conform to <br />Chart 6, Allowance for Expansion Under Test Pressure, Technical Report TR 3119-79, <br />published by the Plastic Pipe Institute (FPI). If there are no visual leaks or significant <br />pressure drops during the final test period, the installed pipe passes the test. <br />F. If any test of pipe laid disclosed leakage significant pressure drop greater than the allowed, <br />the Contractor shall, at hisfher own expense, locate and repair the cause of leakage and retest <br />the line. The amount of leakage, which will be permitted, shall be in accordance with <br />AWWA C644 Standards, <br />G. All visible leaks are to be repaired regardless of the amount of leakage. <br />H. The Contractor must submit his plan for testing to the Engineer for review at least (10) days before <br />starting the test. <br />+ <br />2.8 CLEANING <br />A. At the conclusion of the work, thoroughly clean all of the new pipe lines to remove all dirt, <br />i stones, pieces of wood or other material which may have entered during the construction <br />period. Debris cleaned from the lines shall be removed from the job site. If after this <br />cleaning, any obstructions remain, they shall be removed. <br />1 <br />* * END OF SECTION * * <br />I <br />t 15080A - 7 <br />fiipA tknt+h ppYyclhylenc <br />i P+�r {NL�PfiI <br />l Jeru'.+aF,IrAnwn i'igRcu ymKcl Mcsandl� k«er 6«{w,,.t..v+t. 14:1FRA - N,�F teeatKr pul,Ll,fere Y,pt 111'11'1 ,1nt <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.