My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-090
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 10:34:43 AM
Creation date
3/12/2024 10:17:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/21/2000
Control Number
2000-090
Agenda Item Number
11.H.2.
Entity Name
Tri-Sure Corp.
Subject
Rockridge Sewer Project
Bid Number
2028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Did Item NQ- 2 - HorizontalD'r rill <br />1.1 Scope of Work <br />Under the above Items, the Contractor shall provide all labor, materials, equipment and <br />incidentals necessary to furnish and install high density polyethylene (HDPE) pipe as shown on <br />the contract drawings, as specified herein and as directed by the Engineer, including but not <br />limited to: the excavation for the insertion pit, receiving pit and pipe trench, together with the <br />disposal of all excess materials, including drilling mud such as benonite clay slurry, bracing, <br />sheeting and dewatering, the furnishing and installation of the HDPE, the backfilling of the <br />insertion and receiving pits, hydrostatic testing, maintaining uninterrupted flow of existing <br />utilities, providing access to driveways at all times, constructing and maintaining all bridges <br />required for traffic control, cleaning the site of the work location and protection of utilities, <br />structures, trees, shrubs and lawns, and all other work required for the complete installation of <br />the HDPE pipe. <br />1.2 Materials and Method <br />All pipe shall be installed at locations shown on the contract drawings and as directed by <br />the Engineer. <br />The following sections specified in the Technical Specifications shall also be considered <br />as part of Bid Item No. 02 - Horizontal Directional Drill (HDPF,in its entirety: <br />Se tion L119 <br />02050A Protection and Maintenance of Traffic <br />02320 Trenchless Installation of Pressure Mains by Directional <br />Boring (Horizontal Directional Drilling - HDD) <br />02675 Hydrostatic Testing of Water & Wastewater System <br />These sections are located in the Technical Specifications. <br />1.3 Method of We surement <br />The quantity of horizontal directional drilling to be performed under Bid <br />02 -- <br />Horizontal Directional Drill (il) shall be a unit price bid for all labor, materials, tools, <br />equipment and incidentals necessary to Furnish and install the HDPE pipe and end seals within <br />the limits shown on the drawings. <br />1.4 Bails for Pavnwnt <br />The lump sum price bid for Bidhem No, 02 - Horizontal Directional Drill(HDPE shall include <br />all material, equipment, supplies, fuel, labor, sheeting and bracing, insertion and receiving pits, <br />excavation, dewatering, backfilling, compaction, furnishing and installing of HDPE pipe, <br />sealing the termination pints for the pipe, hydrostatic testing, and all other work as shown on the <br />Contract drawings, as specified herein, or as required by F DEP and the County for a complete <br />installation ready for operation. <br />00310- 10 <br />i _ C:VeremishhhnYun PmjectsTmjc0 • Roekiid,je Sewer ImpruYtr un1%=)10 due <br />DID 11 ENI Od -IMPE <br />
The URL can be used to link to this page
Your browser does not support the video tag.