Laserfiche WebLink
r <br />0 <br />• <br />• <br />1.2.17 Provisions for the construction of temporary storage yards for the storage of <br />materials that are not subject to damage by weather conditions. Materials shall <br />be stored on pallets or racks off the ground. No private property area adjacent to <br />the site shall be used for storage of the contractor's equipment and materials <br />except by expressed written permission of the property owner. <br />1.2.18 Arrangements for a Pre -Construction Conference to review plans and <br />specifications and schedule with the Contractor, Subcontractors and personnel <br />from the owner and engineer, as well as the Contractor's Project Superintendent, <br />and others as necessary. <br />1.3 Method of Nlg-qsti remen <br />The quantity of mobilization to be paid tinder diid Item Na. Dl - jvlobili t` shall be a <br />lump sum amount for all labor, material, tools, equipment and incidentals necessary to mobilize. <br />1.4 Mis for Pa anent <br />The lump sum price bid for mobilization shall include all labor, materials, tools <br />equipment and incidentals necessary to furnish bonds and insurance, site security, staging <br />temporary office, safety equipment, surveying temporary facilities and utilities, shop drawings, <br />submittals, erosion, sediment and dust control. <br />Request for payment for this Bid item will be based on a schedule of values submitted <br />by the Contractor and approved by the Engineer. Partial release for payment under Bid to <br />di( t s}tali be based on receipts of PALd invoices for the various tasks <br />performed. final release for payment under BidItem No,01 -i• .1 'oshall be at the <br />discretion of the Engineer. <br />ENI? 4P SECTION <br />00310-9 <br />Usti l?F.h1 tll • M1igtltt.l"LrlTIOH <br />�`+ 11 Pmirfll'1•'.H+IrcI.jffl{`i 11aJr qp'l, III' J c <br />