My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-090
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 10:34:43 AM
Creation date
3/12/2024 10:17:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/21/2000
Control Number
2000-090
Agenda Item Number
11.H.2.
Entity Name
Tri-Sure Corp.
Subject
Rockridge Sewer Project
Bid Number
2028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />0 <br />• <br />• <br />1.2.17 Provisions for the construction of temporary storage yards for the storage of <br />materials that are not subject to damage by weather conditions. Materials shall <br />be stored on pallets or racks off the ground. No private property area adjacent to <br />the site shall be used for storage of the contractor's equipment and materials <br />except by expressed written permission of the property owner. <br />1.2.18 Arrangements for a Pre -Construction Conference to review plans and <br />specifications and schedule with the Contractor, Subcontractors and personnel <br />from the owner and engineer, as well as the Contractor's Project Superintendent, <br />and others as necessary. <br />1.3 Method of Nlg-qsti remen <br />The quantity of mobilization to be paid tinder diid Item Na. Dl - jvlobili t` shall be a <br />lump sum amount for all labor, material, tools, equipment and incidentals necessary to mobilize. <br />1.4 Mis for Pa anent <br />The lump sum price bid for mobilization shall include all labor, materials, tools <br />equipment and incidentals necessary to furnish bonds and insurance, site security, staging <br />temporary office, safety equipment, surveying temporary facilities and utilities, shop drawings, <br />submittals, erosion, sediment and dust control. <br />Request for payment for this Bid item will be based on a schedule of values submitted <br />by the Contractor and approved by the Engineer. Partial release for payment under Bid to <br />di( t s}tali be based on receipts of PALd invoices for the various tasks <br />performed. final release for payment under BidItem No,01 -i• .1 'oshall be at the <br />discretion of the Engineer. <br />ENI? 4P SECTION <br />00310-9 <br />Usti l?F.h1 tll • M1igtltt.l"LrlTIOH <br />�`+ 11 Pmirfll'1•'.H+IrcI.jffl{`i 11aJr qp'l, III' J c <br />
The URL can be used to link to this page
Your browser does not support the video tag.