My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-090
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 10:34:43 AM
Creation date
3/12/2024 10:17:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/21/2000
Control Number
2000-090
Agenda Item Number
11.H.2.
Entity Name
Tri-Sure Corp.
Subject
Rockridge Sewer Project
Bid Number
2028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1753 r- \ + 1 -- WO -11 LmUmt " OWi <br />1.1 $cope of Work <br />Under the above Item, the Contractor shall provide all labor, materials, equipment and <br />incidentals necessary to restore lawn disturbed by the construction and as shown on the contract <br />drawings, as specified herein and as directed by the Engineer, including but not limited to: <br />furnishing and installing sod, fertilizer, topsoil, water, grading, cutting, and preparation of <br />subgrade, cleaning the site of the work location and protection of utilities, structures, trees, <br />shrubs and lawns, and all other work required for the complete installation of the sod. <br />1.2 Materials and thDd <br />All topsoil and sod shall be installed at locations as specified herein and where directed <br />by the Engineer. <br />The Contractor shall be responsible for the proper protection and maintenance of the <br />sodded areas until a satisfactory uniform stand of grass has been established (minimum of two <br />cuttings). Where sod fails to grow properly, the Contractor shall resod at his/her own expense, <br />until satisfactory to the Engineer. <br />1.3 Method of i4leasurement <br />The quantity of lawn restoration (topsoil and sod) to be measured for payment under3Rid. <br />Lawn o shall be the actual number of square yards of <br />sod laid as measured installed. Measurement will be based on a maximum width of 10 - <br />along the length of the pipeline. Unless otherwise directed by the Engineer, areas requiring <br />restoration beyond the - [eet maximum width shall be done at the Contractor's expense. <br />1.4 Basi, #"Qr Paynrcuts <br />The unit price bid per square yard (S.Y.) of sod shall include: furnishing and installing topsoil, <br />sod, water, grading, cutting, preparation of subgrade, removal and protection of existing <br />trees and shrubs; maintenance of traffic, and all other material, labor, tools, equipment, <br />and incidentals necessary to complete the work. <br />L.. <br />00310-12 <br />II <br />DID ITUS 03 - LAWN tusroa..Troiv <br />'r C7FlffTlliAilflrIAMAIPmitrlt`P,nIKl II(xVidpt So*" IMPImemeM104110 INV <br />
The URL can be used to link to this page
Your browser does not support the video tag.