Laserfiche WebLink
40 <br />40 <br />i <br />r <br />1.3 Method of Measurement and Basis for Payment <br />The method of measurement and the basis for payment under ►��� tte �+ lam. Q5 -Ford <br />Account iCaafinamW shall be as specified above or as jueorgarated.in a fha-nzLj2rdC-r <br />1z"pared by the Engineer. The method of measurement and basis for payment may be altered <br />by the Engineer to include lump sum payments for specific work performed which includes all <br />of provisions (1) through (7) as specified above. <br />The basis for payment shall include the cost of all labor, materials, equipment and <br />transportation necessary to perform the additional work 1= covered by other Bid Items, and as <br />ordered by the Engineer. <br />- <br />00310- 18 <br />C•Vemdxtdahmm PmitasTraitcl - Rocinatr St wtr fmpm vtnKnalloo] 10 acc <br />p I O ITE M 43 - FORC E ACCOUNT <br />